1.
Operating Temperature: RT-950deg. C.
2.
Max. Temperature: 1000deg. C.
3.
Actual Dimension of Furnace Tube: φ 90mm× 2100mm.
4.
Load Bearing of Furnace Tube When Heating: ≥ 25Kg.
5.
The Length of Heating Zone: 1200mm.
6
. Controlled Zone: 3 Zones, K Type thermocouple.
7.
Temperature Control Precision: ± 1deg. C.
8
. Temperature Control Mode: Use Shimaden temperature controller, heating rate is adjustable.
9.
Heating Mode: Use infrared FEC heater, furnace.
10.
Atmosphere: Feed the nitrogen to the chamber first, after emptying the air in the chamber, feed the mixed gases ( nitrogen and hydrogen).
11.
Cooling Mode of Furnace exit: Water cooling.
12.
Gas Flow: ≤ 30 L/min.
13.
Heating up Time of Empty Furnace: ≤ 80min (From RT to 950 deg. C).
14
. Max. Heating Power: 12kW.
15.
Insuation Power of Empty Furnace: 4Kw,
16.
The Temperature of the Furnace Surface: ≤ RT+40 deg. C.
17.
Input Power Supply: 3 phase 50Hz, 380V± 10%.
18.
Overall Dimension: 2300× 700× 1450(L× W× H)(for reference)