Steel Wire Heat Treatment Production Equipment/Wire Annealing Equipment Product Description Production process: Pay-off --> Gas fired diectly annealing furnace --> Lead quenching bath --> Ultrasonic cleaning --> Phosphating/boron --> Take up Successfully apply Ultrasonic cleaning to our Steel Wire Heat Treatment Continuous Line, replace the traditional degreasing and pickling process. Advantage: The solution can be recycled, no pollution to be discharged;To reach the same production capacity, the occupied area is less than traditional pickling bath; No acid mist in the workshop, safe for workers and reduce the damage to workshop. Technical parameter
Sr | Item | Specification |
1 | Raw material | Low carbon, medium carbon, high carbon |
2 | Wire diameter | Φ0.8mm-Φ12.5mm |
3 | Wire number | 8-40 wires |
4 | Speed | 10-60m/min |
5 | Production capacity | 3000-20,000 tons/year |
6 | Energy | Natural gas, Liquid gas, Electricity, Diesel, Coal |
7 | Working hours | 24h continuously |
8 | Line size | 160m(L)x6m(W) |
Gas fired directly annealing furnace:
Ultrasonic cleaning:
Wire Take Up Machine:
Company Information Wuxi Xinke Metallurgical Equipment Co., Ltd was established in 1996,invested and set up by Wuxi Xinke Autocontrol Research Institute. We get more than 20 years exprience being the prefessional design and customized making for steel wire production continuous lines,such as steel wire hot-dip galvanizing continuous line,steel wire electro-galvanizing continuous line,steel wire heat treatment continuous line,and etc. We hold 26 national patents,12 of them are inventive patents.
Our Services We will offer basic layout and electrical system diagram of production line within 30 days after signing the contact. We will supply all information when delivery ,including line electrical drawing,original manual of equipment and instrument table,equipment conformity certificates,list of spare parts,equipement maintanance procedures,drawing and suppliers of quick-wear pats. We will send engineer and high level technician when installing the production line. We will test the whole line for one month and train the operater. We will send engineers to service machinery overseas if necessary.