Steel Dowel, Steel Structure of Melbourne Airport Project
Steel Dowel, Steel Structure of Melbourne Airport Project
Steel Dowel, Steel Structure of Melbourne Airport Project

1 / 1

Steel Dowel, Steel Structure of Melbourne Airport Project

Get Latest Price
Send Inquiry
Model No. : melbourne airport steel dowel
Brand Name :
10yrs

Shenzhen, Guangdong, China

Visit The Store

Product description

  • Melbourne airport runway steel dowel bar
  • Epoxy zinc rich primer or galvanized
  • Size: Φ34/45 x 600/50 x 500mm
  • Material: GB Q345B
  • Expansion rubber caps
  • Fabrication capacity: 3000 tons a month
  • Experience: 20 years, established in 1989
  • Quality certificate: ISO 9001, ISO 14001, OHSAS18001
  • Fabrication standard: GB50205:2002, AS/NZ4100, EN9001, AWSD1.1, D1.4, D1.5
  • Workshops area: 6 large span workshops, 27 x 189 meters in 25000 square meters
  • Projects fabrication scope: steel structures of constructions, infrastructure, equipment, such as airport, metro, bridge, hydropower station, stadium, equipment, warehouse, platform, stadium box beam, box column, welded beam, welded I beam, H beam, channel, butt weld, welded girder, girders and bracing, truss, bracing, curved truss beam, main and secondary truss beam steel structure, warehouse, buildings, equipment mold, steel dowel, screw pile, tower, steel frame and more
  • Production line machines: automatic arc submerge welding machines, CNC cutting machines, blasting machines, drilling machines, carbon dioxide arc welding machine, 32T cranes, press machine, purlin machine, H-beam strengthen machine, shearing stiffener cutting machine, blasting machine, assembling machine and more
  • Material: material traceability, provide steel mill certificate
  • Welding processing and testing: fillet welding, full penetration welding, ultrasonic test
  • Coating treatment: galvanized, zinc rich epoxy primer
  • Inspection and testing: UT, tensile strength, bending, chemical composition analysis, dimension tolerance, coating and more
  • Qualification: WPS, weld workers operation certificate, NDT inspector, the third party
  • Packing: packing plan is confirmed by supplier and client, steel frame, wood, steel strip, pallet, box
  • Transportation: by containers or bulk carrier
  • ITP technical requirement from client
  • Send Inquiry

    Product Alert

    Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

    版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628