Product description
Introduction:
- Applicable for the large commercial and utility scale PV system on a non-sandy ground
- It is suitable for the framed or frame-less module installation
- C post can be pile into the ground 1-2 meters by pile machine quickly, then you can mount the pre-assembly beam structure and clamps easily
Characteristics:
- Structured light, quick installation: instead of precast concrete foundation, install the device directly into the ground (impact pile through the device can enter the depth of the land: 1,500-2,000mm), the basis for this mode significantly reduces installation time and costs
- Applicable to all kinds of venues: compared to conventional concrete piles to install without special requirements and construction is not affected by season or other climate impacts
- Good performance adapted to the environment: you don't need any special preparations in advance, just make sure you installed the land surface were not compromised, there is no corrosion and other processing costs, on the other hand the impact can be recycled, can be better adapted environment-protection equipment
- Positioning hole quick-and-easy: at the time of installation location according to demand moving again and faster installation
Applicable for the large commercial and utility scale PV system on a non-sandy ground
It is suitable for the framed or frame-less module installation
C post can be pile into the ground 1-2 meters by pile machine quickly, then you can mount the pre-assembly beam structure and clamps easily
Structured light, quick installation: instead of precast concrete foundation, install the device directly into the ground (impact pile through the device can enter the depth of the land: 1,500-2,000mm), the basis for this mode significantly reduces installation time and costs
Applicable to all kinds of venues: compared to conventional concrete piles to install without special requirements and construction is not affected by season or other climate impacts
Good performance adapted to the environment: you don't need any special preparations in advance, just make sure you installed the land surface were not compromised, there is no corrosion and other processing costs, on the other hand the impact can be recycled, can be better adapted environment-protection equipment
Positioning hole quick-and-easy: at the time of installation location according to demand moving again and faster installation