Ship marine boat airbags: The arrangements of air bags A1. Launching type Based on the ship shapes, the ship may be launched,using air bags,by either end launching type(see A.2) or side launching type(see A.3) A.2 End launching type A.2.1 There are three ways to arrange air bags when using the end launching type.They are(1) linear arrangement (see figure A.1),
(2) staggered arrangement(see Figure A.2), and (3) two lines arrangement(see figure A.3).As for which arrangement to use, it needs to depend on the ship’s width and the length of the air bags. A.2.2 When the ship’s width is not greater than the effective length of the air bags, the linear arrangement shall be selected. A.2.3 When the ship’s width is greater than effective length of an air bag and less than the effective length of two air bags, then staggered arrangement shall be selected. A.2.4 When the ship’s width is greater than the combined effective length of two air bags, or for special ship such as catamaran HSC or split hopper barge,the two lines arrangement shall be selected.The distance between the near ends of two air bags is greater than 0.2m. A.3 Side launching type A.3.1 For small flat-bottom ship, side launching method may be utilized(see figure A.4).In this case, the air bags of same specification,same diameter and same length shall be used. A3.2 The air bags shall be divided into two groups, and be evenly arranged under the low and the stern ends of the ship.The distance between two air bags shall be made equal.The distance between the ends of two groups shall be greater than 1m but not greater than 10 percent of the ship’s length. A3.3 The hauling rope shall be fixed at the middle of the two air bag groups and be perpendicular to the hull of the ship. Figure A.1 Linear arrangement
Figure A.2 Staggered arrangement
Figure A.3 two lines arrangement
Figure A.4 Side arrangement
CHANGLIN Project
Self-propelled semi-submersible vessel: LOA -156m Breadth-36m Depth-10m DWT-20,000T LDT-12,900T Ship launching date:22ed December ,2009
Bulk cargo ship LOA -229m Breadth-32.26m Depth-20.05m LDT-13,000T Ship launching date:4th July ,2012
Wind turbine installation vessel: LOA -144m Breadth-40m Depth-10.75m LDT-13,000T Ship launching date:3rd November, 2012
"Jiangshunda" vessel: LOA -136m Breadth-22m LDT-4100T Ship upgrading date:2013
Self elevating drilling platform LOA -65m Breadth-60.2m LDT-10,800T Ship launching date:15th Octobor ,2014
Large scale ocean going squid fishing boat LOA -77.8m Breadth-11.6m LDT-1,400T Ship launching date:11th and 17th August, 2014
Cassion moving LDT-2475T Moving Date: 21th April, 2015