1 / 3
Model No. : | C10200 B75 |
---|---|
Brand Name : | Torich |
Section shape : | Round |
Ningbo, Zhejiang, China
Product description
Products Description: Heat Exchanger Seamless Copper Low Fin Tube C10200 B75
Quick Detail:
Low-finned tubes are a reliable solution for controlling the temperature of gases and liquids, or for evaporating and condensing refrigerants. Thanks to their larger heat transfer surface area, they offer considerable potential to save in terms of materials and fill volumes.
Size:
Plain tube (mm) | Finned section dimensions (mm) | Ratio | De | |||
D×t | Tp | dd | dr | di | η | mm |
19×2 | 0.8 | 18.8 | 17 | 134 | 2.8 | 17.9 |
19×2 | 1 | 18.8 | 16.8 | 13.4 | 2.5 | 17.8 |
19×2 | 1.25 | 18.8 | 16.6 | 13 | 2.2 | 17.8 |
19×2 | 1.5 | 18.8 | 16.6 | 13 | 2 | 17.7 |
19×2 | 2 | 18.8 | 16.4 | 13 | 1.7 | 17.5 |
25×2.5 | 0.8 | 24.8 | 23 | 18.8 | 2.8 | 23.9 |
25×2.5 | 1 | 24.8 | 22.6 | 18.8 | 2.75 | 23.7 |
25×2.5 | 1.25 | 24.8 | 22.3 | 18 | 2.5 | 23.6 |
25×2.5 | 1.5 | 24.8 | 22.3 | 18 | 2.2 | 23.5 |
25×2.5 | 2 | 24.8 | 22 | 18 | 1.8 | 23.4 |
25×2.5 | 2.5 | 24.8 | 22 | 18 | 1.6 | 23.3 |
D------Outside diameter of plain end section Dof----Diameter of top fins Dr-----Root diameter of finned section Di-----Inside diameter of finned section T------Wall thickness of plain end section Tp-----Fin pitch De----Equivalent diameter of finned tube L------Plain tube end length |
Applications: Heat Exchanger Tube
The Benefits:
1. Offers 2.5-3 times the external surface area of bare tube
2. Enhanced heat exchanger efficiency means less tube is required to accomplish the same heat transfer as a bare tube
3. Low finned tube can increase the performance of an existing exchanger without the difficult and expensive task of building new shells etc
4. Reduced space and weight can be extremely valuable in offshore production or high elevation distillation columns. Low finned technology can transform large shell and tube exchangers into compact heat exchangers
Product Pictures
Packaging and Delivery
FAQ:
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
Ningbo, Zhejiang, China
Send your inquiry to this supplier