SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder
SAE1045 Honed steel tubing for hydraulic cylinder

1 / 6

SAE1045 Honed steel tubing for hydraulic cylinder

Get Latest Price
Send Inquiry
Model No. : 40mm*30mm - 600mm*500mm
Brand Name : Yinhe
7yrs

Yangzhou, Jiangsu, China

Visit The Store
  • Platform Certification
  • Online Expo

Product description

1. Manufacture Method: Cold drawn, hot rolled+deep hole bored

2. Size: 40mm*30mm - 600mm*500mm

3. Standard: DIN2391-2,EN10305-1,ASTM A519

4. Certification: ISO9001

Product Name:
SAE1045 Honed steel tubing for hydraulic cylinder
Material:
Carbon steel,alloy steel, stainless steel
Standard&Grade:
DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.
Manufacture Method:
Cold Drawn, Hot rolled+Deep Hole Bored
Internal Surface Treatment:
Honing, Skiving&roller burnishing
Size Range:
ID of 300mm max for cold drawing, ID of 500mm for deep hole boring
Delivery Condition:
As rolled, Stress relieved,Annealed,Normalized,Quenched+Tempered
ID Tolerance:
ISO H8
Bore Roughness:
Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes
End finish:
Plain  ends with square cuts,free of burrs
Usage:
Hydraulic cylinder, Pneumatic Cylinder
Chemical Composition
C:0.43-0.50, Si:0.15-0.35, Mn:0.60-0.90, P:0.035 Max, S:0.035 Max
Mechanical Properties
T.S:620 Mpa min, Y.S: 500 Mpa min, Elongation: 10% min
Products Show

Honing Pipe1


Our Service

Marking

Marking

Marking or mechanical stamp on each piece of tube

External surface polishing

We can do polishing to external surface of tubes

Hard Chrome plating

We can do hard chrome plating ro internal surface of tubes



Our Company

WORKSHOP 1


Yinhe Company 2

Factory gate


Our Factory

Workshop


Yangzhou Yinhe Machinery Co Ltd


Packing & Delivery

Packing Details  : Tubings packed in bundles tied with steel strips. Internal&external oil coating. End plastic caps. External packing by PVC bags and knit bags.

Delivery Details : Regular lead time is around 30-45 days.

Container loading: container loading by forklift in our workshop.


Tubes Packages 4

1. Regular packing
2. Regular packing
3. External packing

Tubes Package

4. Container loading
5. Container loading
6. Container loading
Our Certifications
Customer Photo
FAQ

Q: Are you trading company or manufacturer ?

A: We are specialized manufacturer

Q: How long is your delivery time?

A: Generally 30-45 days,depending on delivery time of raw material.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Deposit+balance before shipment,if order value is below USD20000. T/T or L/C is order value is above USD20000. For end users with long term demand,payment method can be discussed. 


Q: How do you ensure quality?

A: We only use raw material from leading steel mills like TPCO,Hengyang Valin,Baosteel,etc. 

We only use raw material with cylinder quality.

We inspect the tubings as cylinders itself, because we know each piece of tube means one or more pieces of cylinders. 

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628