1 / 1
Model No. : | QM4304 |
---|
Product description
ACESSORIES | wool felt |
---|---|
Current Type | AC |
Colour | Blue |
With Accessories Or Not | Yes |
Frequency | 50HZ-60HZ |
Rated Input Power | 2000W |
Voltage | 220V |
Disc Diameter | 180mm |
Body Materials | Plastic |
No Load Rotate Speed | 0-11000r/min |
Specification
Electric Polisher
Cushion size: 180mm
Rated Voltage: 110V/220V
Rated input power: 1200W
Rated frequency: 50Hz
No-load speed:3000r/min
Accessories
1 pcs wrench, 1 pcs handle, 1 pcs cushion
Advantages
1. It is easy to operate and the operator is not easily tied due to the human engineering design.
2. Ball bearing construction for a longer tool life.
3. Look-off button prevents accidental starts.
4. suitable for left hander
Images
Market
Our company’s products are mainly exported to Southeast Asia, the Middle East, Central Asia, Russia, Africa, Latin America, Oceania and other countries, whether it is quality or price has a strong advantage in the international market.
Warning
1. Keep clean of the work area
2. Don’t to use the tools, in the rain, excessive humidity or where flammable liquids and gases
3. The line away from heat, oil and sharp objects, the line should be replaced when it is damaged.
4. Tools will put in a dry place when you don’t use it.
5. Do not exceed the tool\'s ability to work to use, do not use small power tools to do a large load of work to avoid damage.
6. Do not use this tool to do work outside their function.
7. Must wear overalls and wearing protective glasses when you are working
8. Don’t use the tool, you must disconnect the line.
Power Tools Maintenance
Due to Power tools need to ventilation, long-term use of very large internal dust, dust will make gears and bearing (sleeve) deterioration of the dry lubricant mixture increased wear and tear, especially the use of alternative even more. To protect the drill rotation accuracy, reduction of the bearing (sleeve) and excessive wear of the gap, it needs to maintain a very clean housing and processing grease lubrication
Payment Terms | L/C, T/T, D/P, Money Order, Paypal |
---|---|
Minimum Order | 500pcs |
Lead Time / Delivery Time | 35 Day(s) |
Sample Available | YES |
FOB Port | Ningbo,Shanghai |
Target Market(s) | Africa(except Middle East), Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Mainland China, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe |
Send your inquiry to this supplier