PU Sandwich Panel Roll Forming Line/Making Machine
PU Sandwich Panel Roll Forming Line/Making Machine
PU Sandwich Panel Roll Forming Line/Making Machine

1 / 1

PU Sandwich Panel Roll Forming Line/Making Machine

Get Latest Price
Send Inquiry
Model No. : YD-0178
Brand Name : Ytsing
9yrs

Wuxi, Jiangsu, China

Visit The Store

Product description

PU Sandwich Production Line  
Specification
Number of Stations 14 sets
Thickness 0.8-1.2mm
Main Power 5.5KW
Shipment Packing one 40FT container
Forming Speed 10-20mtr./min(Not include shear)
Machine Frame H-BEAM Frame
     
Technical Data
Productivity PU foam shutter slat as the drawing
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Line Direction Left to right while facing operator panel
Overall Machine Length Required 5.6M
Approximate Machine Height 1.0M
   
Complete Line Consist Of
Decoiler
Roll forming
Fomaning&Heating machine
Cutting unit
PLC automatic control cabinet
Product run out table/Auto-Stacker
      We can also design PU sandwich panel roll forming machine according to your specific profile drawing.     Picture                             Delivery Time:       90 days after receiving 30% deposit           Payment:       30% paid by TT in advance and the balance paid by TT before shipping           Our Advantage:       1)---High Quality 2)---Reliable  3)---Durable 4)---Reasonable Price 5)---Good after Service 6)---Passed ISO9001:2000 certification 7)---Passed CE certification           Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example:   Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam,     Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan…    Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania…   Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana   South-America:Chile,Venezuela,Brazil,Columbia,Argentina…   North-America:America,Trinidad and Tobago,Grenada,Nicaragua…                     After-sale Serive:   The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)     Welcome to visit and order!   Note:the machine can be re-designed according clients need!      
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628