Product Description 1.Product Data
Item No | TP F76*1200 |
Tube Length: | 1200mm |
Outer Dia: | 76mm |
Pipe Thickness: | 1.7/2.0/3.0/3.5/3.75/4.0mm |
Set-up θ: | 60mm |
Top Design | 3*M16 |
Screw Height: | 150mm |
Material: | ISO630 Fe A / DIN EN10025 Fe 360 B |
Surface Finished: | Hot Dipped Galv. as standard DIN EN ISO 1461-1999 |
Pcking: | on steel pallet ,in carton or as your asking |
Payment Term: | 30% prepayment ,the balance at sight B/L copy. |
Delivery Time: | 35days after get 30% prepayment |
2.Picture of Product ground screw
View more 3.More Specifications to Choose
Model Number | Pipe Dia(mm) | Length(mm) | Pipe Thickness(mm) | Weight (m,kg) |
TP N60*550 | 60mm | 550 | 1.5~2 | 1.1 |
TP N67.5*580 | 67.5mm | 580 | 2~4 | 1.5 |
TP N67.5*560 | 560 | 1.8 |
TP N67.5*700 | 700 | 2 |
TP N67.5*800 | 800 | 2.5 |
TP N65*800 | 65mm | 800 | 2~4 | 2.5 |
TP N65*1000 | 1000 | 3.5 |
TP N65*1200 | 1200 | 5.8 |
TP N65*1600 | 1600 | 8 |
TP N65*1800 | 1800 | 8.9 |
TP N76*800 | 76mm | 800 | 2~4 | 3.3 |
TP N76*1000 | 1000 | 4.1 |
TP N76*1200 | 1200 | 6.9 |
TP N76*1600 | 1600 | 9.2 |
TP N76*1800 | 1800 | 10.1 |
TP N76*2000 | 2000 | 12.8 |
TP N76*2500 | 2500 | 17 |
TP N76*3000 | 3000 | 20 |
TP N89*800 | 89mm | 800 | 2~4 | 4 |
TP N89*1000 | 1000 | 6 |
TP N89*1200 | 1200 | 7 |
TP N89*1600 | 1600 | 11 |
TP N89*1800 | 1800 | 13 |
TP N89*2000 | 2000 | 14 |
TP N89*2500 | 2500 | 20 |
TP N89*3000 | 3000 | 25 |
TP N114*1600 | 114mm | 1600 | 2~4 | 13 |
TP N114*1800 | 1800 | 14 |
TP N114*2000 | 2000 | 21 |
TP N114*2500 | 2500 | 25 |
TP N114*3000 | 3000 | 30 |
4.Applications of ground screw
1.Timbe Construction |
2.Solar Power Systems |
3.City and Parks |
4.Fencing Systems |
5.Road and Traffic |
6.Sheds and Contaiers |
7.Flag Poles and Marks |
8.Event Structures |
9.Advertising and transport technology |
10.Photovoltaic installations |
5. Advantage of TP ground screw
1.Be installed with no digging and no concrete. |
2.Minimize disturbance to environmentally sensitive sites |
3.Easy deconstruction allows instant relocation |
4.Proven high pressures and drawing force |
5.Time and cost effective |
6.Recycle |
7.No Soil Sealing |
Workshop of Products 6.Workshop of Products
Technique process: 7. Operation Process
Operating Step 1: |
Cutting the hollow pipe in sizes as customer’s request. |
Operating Step 2: |
Adopt automatic machines to drill holes on the upper end. |
Operating Step 3: |
Make the pipe heated and softened in tail end with heating machine. |
Put the heat pipe into the pipe-shrinking machine promptly to make the tail end into cone-shape. |
Operating Step 4: |
.Use the Screw-thread automatic welding machine to welding the screw-thread surround the whole pipe automatically and most effectively. |
.Hand welding the flange on the upper top of the pipe skillfully and meticulously. |
Operating Step 5: |
Hot-dip Galvanization |
Operating Step 6: |
Packing on steel pallet or as customer’s request. |
Packaging & Shipping 8 Packing of Products
9 more photos
Our Services 10 Our Service
WHY CHOOSE THINKUP GROUND SCREWS? |
1.Quality control and stability: Applied with high quality, each product is produced under strict quality control at every manufacturing process from raw materials to final testing, which ensures our products come with perfect performance. |
2.Reasonable price: we frequently strive to offer better, flexible and win-win price. |
3.Flexible OEM design: full OEM service to realize customer own brand packing. |
4.Fast delivery: we will ship out your order within 30 business days after verification of payment and confirmation of the order. If out of stock, we will inform you in advance. |
5.Premium custom service: fast response within 24hrs. Over 6 years of experience in customer service, problem solving, marketing and logistic delivery, team support from professional sales team. |
11. contact information