1 / 5
Model No. : | XXR018 |
---|---|
Brand Name : | XXR |
Chengdu, Sichuan, China
Product description
RSBAQW serious Pressurized Maintenance Heat Shrink Cable Sleeves also named as Pressurized Repair Heat Shrink Tube, Pressurized Heat Shrinkable Closures and Pressurized Cooper Splice Closure. It can be Widely used in overhead erection of pipeline, the splice closure of buried and submarine communication cable; can work under an environment from -30ºCto 90ºC for a long time. The technical size of its main components is up to the industry standard: YD/T 590.1-2005 and YD/T 590.2-2005. Its main plastic parts` surface is smooth and no bubbles, cracks, trachoma; no burr on the surface of the metal.
Product structure and features
it includes: heat shrinkable material, hot melt adhesive and installation accessories.
Performance characteristics:
A, high heat shrink rate, strong contraction force, simple and convenient construction.
B, it can be used in joint sealing under all weather conditions.
C, high reliability of water-proof and moisture-proof because of its unique structure and good adhesive.
Molde
Max Joint external diameter(mm)
Min cable inside diameter(mm)
Cable(pairs)
Cable Dia 0.4
Cable Dia 0.5
45 * 15
45
15
100-500
100-400
65 * 20
65
25
600-1000
400-800
95 * 30
95
30
1200-2400
800-1800
FAQ
1.When can I get the
price?
We usually quote within 48 hours after we get your inquiry. If you are
very urgent to get the price, please call us or tell us in your email so that
we will regard your inquiry priority.
2.How can I get a sample to check your quality?
After price confirmation, you can require for samples to check our quality.
3.How long can I expect to get the sample?
After you pay the sample charge and send us confirmed files, the samples will
be ready for delivery in 2-4 days. The samples will be sent to you via express
and arrive in 4-8 days. You can use your own express account or prepay us if
you do not have an account.
4.What about the lead time for mass production?
Honestly, it depends on the order quantity and the season you place the order.
Generally speaking, production lead time is within 2~4 weeks.
5.What is your terms of delivery?
We accept EXW, FOB, CIF, DDU, DDP etc. You can choose the one which is the
most convenient or cost effective for you.
6.Terms of payment?
We accept payment as the following.
1).30% T/T deposit, 70% balance before delivery.
2).100% TT in advance.
3).western union
Chengdu, Sichuan, China
Send your inquiry to this supplier