Prefabricated Steel Structure House Building Product Description Steel structure components are made in the factory, which can reduce the workload, shorten the construction period, conform to the requirements of the industrialization, it can not only save resources but also reduce some unnecessary pollution The quality of steel structure factory production is reliable, precise size, easy to install, easy to cooperate with related department.3. Light weight, high strength, the weight of steel structure building is 1/2 of the reinforced concrete building; Meet the needs of the houses are expounded and the net area is about 4% higher than that of reinforced concrete house. Steel can be recycled, there’s less pollution to the environment construction and demolition. These advantages are the value of steel structure house. It used these advantages to prop up the "security umbrella" for life. Safety and reliability, good seismic and wind resistance performance, load capacity and seismic capacity can reach 8, flame to fail in the shock loss is its style.
Material Detail
Component | Specification |
Main frame | Hot-dip galvanized or painted steel ,"H” steel, ”C” and ”Z ” cold-formed thin-walled section steel |
Roof | 50mm-150mm EPS, PU, Rockwool sandwich panel/color steel roof sheet/ glazed roof tile |
Wall | 50mm-150mm EPS, PU, Rockwool sandwich panel. |
Door | Sandwich panel door, security door or electric roller shutter door |
Window | PVC sliding, aluminum alloy or shutter |
Production Process
Packaging & Shipping Transportation is a one of the important process: Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow: 1. 40'HQ and 40'open top container In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures. 2.Break bulk At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space,customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space. Remark: When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc.), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening. For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.
installation Usually steel structure building is a large installation engineering in the process. Some customers may need SBS assign the professional technical engineer to supervise the installation on site overseas. To such situation, customer should coordinate with us for following aspects: Customer should provide:
1. Translator or assistant on site.
2. All costs raised including:
A. visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3. The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4. Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
If the customers need our workers to help installation, your can contact us and must prepare the above reference materials.
Market
Services
Company Profile:
Foshan Shengbang Steel Structure Co., Ltd.Possesses professional large-scale steel structure production equipments and the automatic spraying production line, so we can satisfy the different customers demand.We takes "build your future" as mission and takes company growth as premise.The company has trained many high quality marketing personnel, professional technician and construction workers.We take the customers' demand as the guidances, then provide reasonable, scientific and effective solution for customers.We regard practical growth, innovationand group solidarity as our company spirit, so that we can offer all round service to customers.
FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District, Foshan, Guangdong Province, China
Tel:0086-757-63323396 Fax:0086-757-81196682