Plant concrete curing agent floor
Plant concrete curing agent floor
Plant concrete curing agent floor

1 / 1

Plant concrete curing agent floor

Get Latest Price
Send Inquiry
Model No. :
Brand Name : Kasole
6yrs

Jiangmen, Guangdong, China

Visit The Store
  • Platform Certification

Product description

Product description:

The concrete curing agent floor is dirt-resistant and easy to clean. After the concrete floor is cured, the anti-permeability ability has been significantly improved. The oil and water vapor will not easily penetrate into the cement cured floor. When the floor is stained with oil or water, it only needs to be treated in time without leaving traces. It is still lasting as new, and only a mop is required for cleaning. Vehicles such as forklifts and trailers will not leave traces such as tire marks.

Features of this water-based curing agent:
1. A colorless, odorless, non-toxic liquid that can deeply penetrate the floor and make the surface produce a special hardening effect
2. Moisture-proof, anti-seepage, anti-pollution, easy to clean
3. Improve compressive strength and impact resistance
4. Improve chemical resistance


Plant concrete curing agent floor

Product features:

1, reduce the concrete surface shrinkage and cracks.Metal Floor Hardener.

2, make the cement more fully hydration, and react with the free calcium and magnesium ions in 

the concrete to form high hardness, improve the surface strength and wear resistance of the ground.

3, The construction is convenient, spraying can be carried out during the whole protection period.
4, no longer need wet sacks, sand and polyethylene and other curing materials.
5, The usual ambient temperature and working conditions can be quickly conjunctiva in 60-120 minutes.
6, high quality, high efficiency, saving water resources and labor.
7, non-toxic, odorless, no pollution, no burning
8, does not affect the other paving construction, such as paint, paint, etc.Sky Blue Metal Floor Hardener.

Plant concrete curing agent floor

Construction instruction:


1, the material should be fully mixed before use.
2, the final surface of the calendered concrete surface is sprayed with a curing agent uniformly on its surface.

3, After the calendering, the construction time is about 24 to 48 hours (depending on the ambient temperature 

and humidity at that time). The basic requirement is that there is no free water on the surface. If you do not 

have spraying equipment, you can also use soft brush or roller construction, construction should be careful to 

avoid damage to the concrete surface.

4, after the template is removed, the facade concrete immediately spray water curing agent.Red Metal Floor Hardener.

5. The concrete surface to be treated shall be free of traces of oil, paint, etc. so as not to affect the adhesion of the water-based 

curing agent to the 


Plant concrete curing agent floor



Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628