PE/PP PAKING MACHINE FOR CORRUGATED CATON BOX
PE/PP PAKING MACHINE FOR CORRUGATED CATON BOX
PE/PP PAKING MACHINE FOR CORRUGATED CATON BOX
PE/PP PAKING MACHINE FOR CORRUGATED CATON BOX

1 / 2

PE/PP PAKING MACHINE FOR CORRUGATED CATON BOX

Get Latest Price
Send Inquiry
Model No. :
Brand Name :

Product description

Product Description Detailed Images Packing & Delivery 1.Q: Are you a factory or trading company?
A: We are a manufacture which is specialized in the production of various kinds  of carton equipments for 31 years.(with export license)
2.Q: Where is your factory located? How can I visit here?
A: Our factory is located in 200 meters road east and 290 kilometer 104 country road south town Dongguang county Hebei province.And our old company address ins located in Lisiwei industrial zone Dongguang county Hebei province.
We can pick you up if you need, welcome to visit our factory.
3.Q: What are your products?
A: We are specialized in producing 3ply, 5ply, 7ply corrugated cardboard 
 production line, high speed printing machine, ordinary printing machine, single facer, rotary die cutter and other corrugated cardboard production equipments.
4.Q: How does your factory do regarding quality controlling?
A: Over the years our company take “the quality first” “integrity-based”
  corporate purpose always meet users’ requirements as our sole purpose, 
 providing the products with excellent quality, professional technology. 
 XINHUA packing machinery CO.,LTD always attach great importance to quality controlling from the very beginning to the very end .
1)All raw material we used are environmently-friendly
2)skillful workers care every details in handlling the producing and packing process
3)Quality control department specially responsiblle for quality in each process.
5.Q: How is the evaluation of the products.
A: Products are distributed Russia, the Middle East, Africa, Southeast Asia, 
EU and other countries and throughout the country. Product quality and enterprise reputation get the high praise at home and aboard.
6.Q: What is the payment terms?
A: T/T, it is 30% deposit due at placing order and 70% balance due before loading
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628