1 / 5
Model No. : | TY Floof deck 688 |
---|---|
Brand Name : | Tianyu |
Product description
Abut us
We are the manufacturers all types of roll forming machine.
Our factory is one of the earliest Roll Forming Machine Manufacturers in China Botou City (found in 1996 with more than 15years experience and covers an area of over 20000 square meters,has two seperated factory.),
We are not only produce different types of professional roll forming machines, but also develop intelligent automatic roll forming production lines,
C&Z shape purline machines,
highway guardrail roll forming machine lines,
sandwich panel production lines,
decking forming machines,
light keel machines,
shutter slat door forming machines,
downpipe machines,
gutter machines, etc.
All the parameters are only for reference, we can manufacture Roofing Sheet Roll Forming Machine as per your profile drawings.
688 Floor Deck Panel Roll Forming Machine
Roll Forming Machine Porfile Drawing
Roll Forming Machine Flow Chart
Roll Forming Machine Configuration
1.Decoiler |
2.Feeding Device |
3.Roll Forming Unite |
4.Cutting Systerm |
Roll Forming Machine Specification
1.Feeding Material | steel plate,PPGI |
2.Thickness of Plate | 0.2-0.8mm |
3.Frame | 400H steel |
4.Diameter of Roller | Φ95 |
5.Material of Roller | 45# steel |
6.Cutting Material | Cr12 |
7.Middle of Plate | 18mm |
8.Chain | 2.6inch |
9. Power | 7kw |
10.Transducer | "Delta" Brand |
11.PLC Control Systerm | "Delta" Brand |
12. Weight of Machine | about 2.8 tons |
13. Roller Stations | 26 rows |
14. Dimension | 13000*1500*1200mm |
15. Forming Speed | 8-12m/min |
Making Roll Forming Machine Details
Roll Forming Machine Packing
1.Tighten to container with steel wire rope and welded machine with container by angel iron.
2.Main forming machine and decoiler is naked(If you need,we can also packed with water-proof plastic).
3.PLC control systerm and motor pump are packed with water proof paper coverage
Roll Forming Machine Loading
Installation&Commissioning
One or two engineers will be assigned for the installation,commissioning and training for the maximum duration of 15 working days,the cost are invoiced separately on basis of the payment conditions and travel expenses valid at that time.The buyer had to take care for the pre-installation and commissioning preparations before arrival of seller's technicians at the buyer's factory site.
Warranty
12 months,starting from the date of acceptance and turnover by the buyer.
We hope that the information,terms and conditions above mentioned are in according to your requirements.In case you have further questions or clarifications,pls feel free to consult us for further explanations.
Send your inquiry to this supplier