Metal Parts Powder Coating Line
Metal Parts Powder Coating Line
Metal Parts Powder Coating Line

1 / 1

Metal Parts Powder Coating Line

Get Latest Price
Send Inquiry
Model No. : colo-800
Brand Name :

Product description

Metal parts powder coating lineDesign basis of steel control cabinet powder coating line1. Name of workpiece: Steel control cabinet2. Max hanging size on each hanger: L2250mm× W600mm× H1000mm3. Loading capacity on hanging hook: ≤ 100kg4. Suggested interval between 2 hangers: 800mm5. Conveying speed: 1m/min6. Output: 60-75pcs per hour7. Spraying method: 4 auto spray guns (match on 2 reciprocators) & 2 manual spray guns8. Heating source: Natural gas (Other choices are available: Electricity, oil or coal)9. Pretreatment system: Immersion tank type10. Required plant size: L52m× W28m× H6.5mmDesign description for control cabinet powder painting line1. According to the shape of control cabinet, we design the pretreatment to be economical immersion tank type with 6 stage processings. 2. After chemical cleaning, he pre-treated workpieces will be conveyed to drying furnace for water removal on their surface. The drying furnace is designed being tank type to match with immersion pretreatment tanks, and with a top-door design for easy access of pre-treated workpieces. 3. After drying, the workpieces are ready for powder particle adhesion. Please manually feed them on auto powder painting line. For a better painting result, the spray booth, waster powder recycling system, reciprocator adopts advanced equipments in China through our careful selection. And the spraying guns, both auto and manual are imported from foreign famous company for a longer service life. Then these workpieces will be sent to gas-fired furnace tunnel to let powder melt into a smooth coating.
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628