machine of soap factory
machine of soap factory
machine of soap factory
machine of soap factory
machine of soap factory

1 / 3

machine of soap factory

Get Latest Price
Send Inquiry
Model No. : QYS-
Brand Name : QY

Product description

machine of soap factory    machine of soap factory  introduction Full line includes Soap Mixer, three roll mills, Duplex Vacuum Plodder, embossing & cutting Machine, Toilet Soap stamping Machine, Refrigerators, whole set of conveyors & steel operation platform. Capacity Option 500kg/hr, 1200kg/hr, 2000kg/hr & 4000kg/hr.    machine of soap factory details pictures      machine of soap factory samples:cubic shape and round shape         machine of soap factory  line details:        machine of soap factory packing      machine of soap factory  whole production line process parts

NO

Name

1

Soap Mixer

2

Three Roll Mills

3

Duplex Vacuum Plodder

4

Embossing &Cutting Machine

5

Toilet Soap Cold Stamping Machine

6

Refrigerator(Chiller)

7

Whole set of Conveyors

8

Steel operation platform

   machine of soap factory  our factory workshop    machine of soap factory chatting online ways as follows    machine of soap factory other information 1. Delivery Term FOB ShangHai 2. Warranty One year after shipment. 3. Delivery Time 60 working days after receiving the down payment 4. Package Wooden Case 5. Transportation CLC or as customer requirement 6. Payment Terms Payment Terms 30% down payment plus 70% balance payment by TT before shipment. (After the completion of the machines, customers can dispatch technician for acceptance testing. After the test, 70% T/T remaining payment before shipment. 7. Installation/Operation/ Service/ Maintenance Manual In English 8. Machine Drawing / Layout Detail in Auto CAD format (as for actual workshop) 9. Installation and Commissioning Before installation, the seller will provide the layout drawing with dimensions, and information of total line power, individual machine power, power connections, water &air input and output position, total water consumption. After the machines arrived in buyer site and put into place, the buyer must connect the water, electricity, air and vacuum gas with the machines, then the seller shall send 2-3 technicians to help commission the line for production. The buyer shall pay them US$70/Person/Day and their round-trip air tickets from China Nantong factory to buyer’s factory, the visa application fee, food, transportation and accommodation. The working time of technicians is 8 hours per day. The buyer shall also provide an English-Chinese translator for help and coordination. 10.Power:Standard machine is 3 phase 4 wire, 380V, 50Hz, but we can change it according to the buyer local electrical standard. 11. Pre-shipment Inspection a). Supplier should trial run whole line at supplier's factory before shipment; b). Supplier has to run the machine at least 1hour for each product; c). All raw materials for that trial run to be arranged by buyer at their cost
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628