hopper lift concrete plant
hopper lift concrete plant
hopper lift concrete plant
hopper lift concrete plant
hopper lift concrete plant

1 / 3

hopper lift concrete plant

Get Latest Price
Send Inquiry
Model No. :
Brand Name :

Product description

When mixing blades wear more than the standard, should trailer concrete pump be promptly repaired or replaced. After the job movable concrete plant for sale, deal with mixer conduct a comprehensive clean; must cut off the power or remove the fuse when the operator must enter the barrel, the lock switch boxes Hollywood, hang a "DO NOT TURN" signs, and there should be someone outside the guardianship. Job should hopper landed to the bottom of the pit, when the need rises, the application movable concrete mixing plant of the chain or bolt anchored. Winter jobs, water pump, turn on the water switch should be, the amount of water in the stagnant water drained. Mixer at the venue mobile or long-distance transport, should feed hopper elevated to the top dead center, insurance chains or latch lock. Concrete mixer should check the project at a time: Inspection of aircraft is stable. Leaves and stir blade support arm connecting bolts are secure. Feeding rack connecting bolts are tightened. Pumps diversion whether to add a little piping is smooth. Should be checked after each use of the concrete mixer project. Clean mixing tube inside and outside the discharge door, fouling on the hopper, and rinse well with water. Hopper park and brake pin mobile concrete plants inserted in the transport position, no debris in the hopper. Cut off the power supply, to locked hopper lift concrete plant electrical control box. Where appropriate, filling the lubrication points the necessary lubricant (grease). The storage in the water supply system should be fully drained. Concrete mixer week should check the project. 1, check the wire rope wear and shows that coating a little lubricant, wire rope wear to a certain extent, should be replaced. 2, check the gearbox oil surface, oil pump oil, check lubricating parts, concrete trucks supplier filling oil to the hopper wheel bearings and roller bearings. 3, Water supply device should be kept clean to prevent concrete batching stations manufacturer blockage of the suction valve checks cleaned once.
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628