1 / 1
Product description
The 22 km long road is vital important in the new Hongqiao Hub, which is designed to work as a new transportaion center in Hongqiao disctrict, connecting G42/G2 (from west/north), G60/G92/G15 (from south/southwest) with Hongqiao airport and Shanghai Meglev.
The critical requirements include: to do pre-assembly at shop, to transport the 4.5-meter wide steel members to Shanghai and erect the bridge at downtown area. The errection completed early 2010, and the bridge is opened to public before May, 2010, the opening of World EXPO 2010.
Project Type: Steel Bridge
Steel Tonnage: 2,800T
Steel Grade: Q235 and Q345
Coating: painted
Project Owner: Shanghai Municipal Authority
Designer: Shanghai Municipal Engineering Design Institute
Detailer: Huaxing Steel Structure Co., Ltd.
Steel Fabricator: Huaxing Steel Structure Co., Ltd.
Steel Erector: Huaxing Steel Structure Co., Ltd.
Place of Origin | Ningbo, China |
---|---|
Standard | GB,ASTM,DIN,JIS,BS,AISI |
Type | Heavy Duty |
Welding | Arc submerging, carbon dioxide arc, electroslag |
Currency Settlement | USD, EUR |
Steel Grade | Q235B, Q345B |
Weight Measurement | Actual Weight |
Design | by customer or by us |
Shop Detailing | by us |
Surface Treatment | Shot Blasting |
Painting | 1/2 layers of primer |
Payment Terms | L/C or 50% as DP, 50% against the copy of B/L |
Vadility of quotation | 15 days |
Transportation | by truck/vessel in bulk or container |
Welding Testing | Ultrosonic, X-ray |
Send your inquiry to this supplier