High quality cold mix colored asphalt supplier from China
High quality cold mix colored asphalt supplier from China
High quality cold mix colored asphalt supplier from China
High quality cold mix colored asphalt supplier from China
High quality cold mix colored asphalt supplier from China

1 / 3

High quality cold mix colored asphalt supplier from China

Get Latest Price
Send Inquiry
Model No. : GCA01
Brand Name : Go Green

Product description

High quality cold mix colored asphalt supplier from China     Go Green Cold Mix Colored asphalt is a new patented high technology product, uses eco-friendly cold mix processing and significant ultra thin overlay technology, the material can be storaged and shelf life unopen up to six months. Its suitable for landscaping paving, sport and leisure, public parks and gardens, bus lane, bicycle path as well as light traffic driveway paving. The paving thickness is only 1.0-1.5cm, which greatly reduce the material cost.    Different color avaiable     Outstanding Features
Go Green Micro-Paving Cold Mix Color Asphalt has some basic performances such as soft, easy to compact, water stability, long shelf time, excellent strength, construction at normal temperature, they are generally described as follows:   A. Cold mix technology. Paving thickness only 1.0-1.5cm.   B. Noise reduction, Anti-slip and Fog-proof.   C. Stick to the original pavement surface closely   D. Storage up to 6 month   E. Excellent resistance to water damage.   F. Environmental Protection   G. Construction time no limitation.   H Different color available, lively colors protection    Application Area     Package are available in 20kg bag and 1 ton bag       Step one:   Preparation   1.   The product construction temperate should be above 0°C, recommend to construct above 5 °C   2.   Clean the Debris of the road. The surface should be free of ice, standing water, snow, and loose material.   Step two:   Paving 1.0-1.5cm thickness by standard asphalt paver.   Step Three:   Compact the surface as soon as possible, after  1-2 hours, compact 4-5 times to guarantee the compaction without crashing aggregate.   Step Four:     Close traffic completely after construction. till pavement surface is dry and hard, depends on the weather, usually open to traffic after 6-12 hours.          Certification  
  Our Market     Our Service       Welcome to contact us, or call us 021-61053027, we will reply to any of your question at the earliest time.  
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628