GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET
GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET
GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET
GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET
GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET

1 / 3

GEE ASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET

Get Latest Price
Send Inquiry
Model No. : Carbon Steel A105 WELDOLET
Brand Name :
10yrs

Cangzhou, Hebei, China

Visit The Store
  • Platform Certification

Product description

WELDOLET , 14`` TO 8`` CARBON STEEL PER ASTM A105N , SCHEDULE 120 X SCHEDULE 160 , BEVELLED ENDS , HEADER BY BRANCH SIZE , PER MSS SP 97 , MATERIAL TO MEET THE REQUIREMENTS OF NACE MR0175



Moq:1pc.Brand:GEEASME B16.11 14"*8" *SCH80 Carbon Steel A105 WELDOLET
GEE Belif : Global Excellent Exporter ,More than Made In China.
We are not only Manufcturer , we also a transmitter of More than Made In China.

Company:

Hebei Haihao High Pressure Flange &Pipe Fitting Group

Gee pipe Mill Co.,Ltd.

Status

Manufacturer from 1982 year with 660 workers

Trade mark Brand:

GEE

Certificate

ABS ,ISO9001:2008 ,API 6H ,CE
Manufacture License of China Pressure vessels.

Lab

Laboratory of CNAS

Mainly Products:

Steel Flange Steel Elbow

Steel Tee Steel Reducer

Gasket bolt&nut

Progress:

Forged and Hot rolled

Size:

1/2[--58"

Carbon steel& Stainless Steel &Alloy steel& Duplex Stainless

Standard Mark:

GEE/ OD WT /Pressure / Standard / Material /Heat number

MOQ:

1 piece

OEM & Drawing:

Accept

Sample cost

we don't offer free samples,but will reimburse the buyer once an order is confirmed.

GEE Advantage:

For Project :we have the best Quality

For Wholesaler: we have the best price and OEM .

For Retailer : we have the different Package style .

(Elbow/Tee/Reducer/Cap)1/2"-80"/Sch10-160 XXS

Material:CS:ASTM A234 WPB/MSS-SP-75 WPHY42/46/52/56/60/65/70

ASTM A420 WPL3/6 (Low Temp)

SS:ASTM A403 WP 304/304L/316/316L/321/317/310/347

AS:ASTM A234 WP1/5/9/11/22/91

Standard:ASTM/ANSI/JIS/DIN/GB


Main Advantages:

1.Material:According to the standard and approve ISO,ABS certificates.

Accept client`s test.

2.Package:as per standard or client`s requirements.

3.Delivery Time:

Storage: within 7 days;

Production: usually 30 days, large quantity as per the factory production schedule.

Production capacity: 1000 MTS per month

4.History:Manufacturing 32 years experience.

5.Brand:GEE Pipe


Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628