1 / 1
Model No. : | EX200 ZAX240 |
---|---|
Brand Name : | HITACHI |
Product description
NO. | NAME | PART NO. |
1 | PC200 track roller | 20Y-30-00016 |
2 | PC300 track roller | 207-30-00510 |
3 | D65 single track roller | 16Y-40-09000 |
4 | D65 double track roller | 16Y-40-10000 |
5 | D85 single track roller | 155-30-00124 |
6 | D85 double track roller | 155-30-00114 |
7 | D155 single track roller | 175-30-00486 |
8 | D155 double track roller | 175-30-00496 |
9 | D65 idler assy | 16Y-40-03000 |
10 | D85 idler assy | 154-30-00291 |
11 | D155 idler assy | 175-30-00572 |
12 | D65 carrier roller | 16Y-40-06000 |
13 | D85 carrier roller | 154-30-25111 |
14 | D155 carrier roller | 175-30-00513 |
15 | PC200-6/-7 tension | 20Y-30-12110 |
16 | PC220-6/-7 tension | 20Y-30-02250 |
17 | PC300-6/-7 tension | 207-30-74141 |
18 | PC400-6 tension | 208-30-74140 |
19 | track links | 190ML-38000 |
20 | track links | 190ML-45000 |
21 | track links | 190ML-47000 |
22 | track links | 190ML-49000 |
23 | D65 transmission | 16Y-15-00000 |
24 | D85 transmission | 154-15-31000 |
25 | D155 transmission | 175-15-00226 |
SD16 | A-203-510-00 | track shoe ass’y |
A-203-510-01 | shoe, track | |
SD16L | 16L-41-00000 | track, shoe ass’y |
16L-41-00001 | shoe, track | |
SD22 | 154-32-11006 | track shoe ass’y |
154-32-11113 | shoe, track | |
158-41-00001 | shoe, track | |
22M-42-00002 | track shoe | |
SD23 | 216MA-39156 | track shoe ass’y(560mm wide) |
SD23S | 216MA-39161 | track shoe ass’y(610mm wide) |
216MA-39166 | track shoe ass’y(660mm wide) | |
216MA-41156 | track shoe ass’y(560mm wide) | |
216MA-41161 | track shoe ass’y(610mm wide) | |
216MA-41166 | track shoe ass’y(660mm wide) | |
216MA-00156 | shoe track(560mm wide) | |
216MA-00161 | shoe track(610mm wide) | |
216MA-00166 | shoe track(660mm wide) | |
216RA-45491 | track shoe ass’y | |
216RA-00491 | shoe track |
WEIGHT | RECOMMENDED TRANSPORT MEANS | TRANSPORT TIME | COMMENTS |
<50kg | express- | 3-7 days | fast |
UPS/DHL/FEDEX | convenient | ||
door to door service | expensive | ||
50-150kg | by air | 3-10 days | fast; |
economic; | |||
consignee has to do customs clearance | |||
150>kg | by sea | 10-50 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance | |||
2x20' or 1x40' | by rail | 20-35 days | slow; |
economic; | |||
it takes some time for customs declarance and clearance; | |||
only full container load accepted( MOQ:2x20' or 1x40' ) |
Send your inquiry to this supplier