Clean and Easy Installed high Efficiency 5 Ton Steam Gas Diesel Boiler Product Description
Item\Model | WNS0.5-0.7-Y(Q) | WNS1.0-0.7-Y(Q) | WNS1.5-0.7-Y(Q) | WNS2-0.7-Y(Q) | WNS2-1.25-Y(Q) | WNS4-1.25-Y(Q) | WNS6-1.25-Y(Q) | WNS8-1.25-Y(Q) | WNS10-1.25-Y(Q) | WNS15-1.25-Y(Q) | WNS20-1.25-Y(Q) |
Rated capacity kg/h | 500 | 1000 | 1500 | 2000 | 2000 | 4000 | 6000 | 8000 | 10000 | 15000 | 20000 |
Rated working pressure MPa | 0.7 / 1.0 / 1.25 |
Rated steam temperature ℃ | 170 / 184 / 194 |
Design efficiency % | ≥ 92 |
Fuel consumption | light oil kg/h | 37 | 72 | 97 | 144 | 146 | 285 | 424.8 | 560 | 643 | 1042 | 1389 |
heavy oil kg/h | 38 | 76 | 105 | 154 | 156.5 | 305.5 | 455.3 | 600.2 | 689.2 | 1117 | 1489 |
natural gas Nm³/h | 44 | 85 | 116 | 172 | 174.3 | 340 | 507.1 | 668.6 | 767.7 | 1244 | 1659 |
Chimney diameter | DN250 | DN350 | DN350 | DN350 | DN350 | DN500 | DN500 | DN600 | DN650 | DN800 | DN900 |
Largest transportation size | L (mm) | 1950 | 2400 | 3300 | 3700 | 3400 | 4600 | 4800 | 6400 | 7200 | 7500 | 9150 |
W (mm) | 1300 | 1670 | 1660 | 2000 | 2100 | 2550 | 2750 | 2750 | 3200 | 3500 | 4000 |
H (mm) | 1500 | 1890 | 2050 | 2100 | 2368 | 2604 | 2950 | 3114 | 3262 | 3850 | 4500 |
Notes:This form only for your reference, if any changed, please refer to factory technical documents. |
Features:
| Advantage: 1-Large heating surface
2-High thermal efficiency
3-Precise temp. control 4-Clean combustion, less pollution >>>Click Here |
1. WNS series of oil fired boiler uses the standard three return trip technology the entire wet back structure. 2. The furnace transfer and breathing tube radiation heat convection rational design, layout of adequate heating boilers, high thermal efficiency. 3. This furnace water capacity, full heat exchanger, especially for medium and large sized boiler. 4.This furnace used to burn the center of a unique technology,the entire wet back structure, the furnace volumn is big. make full use of radiation furnace heat exchanger,and through the combustion of fuels burnout level, making boiler thermal efficiency improved greatly. 5. This simplifies the furnace heating surface design,especially for the low-power boiler.
Why choose our boiler? 1. Lower dust emission & SO2 emission & NOx emission, dust emission concentration < 30mg/m³ SO2 & NOx emission concentration < 18mg/m³. 2. We supply 2 units Water Pump (one duty one standby) which from the famous pump manufacturer. 3. Boiler can achieve automatic temperature control & pressure control & feed water control & feed fuel control & safety indication. We also freely supply you a set of inner parts of Electric controller for standby. 4. Boiler with stainless cladding, anti-corrosion & anti-rust & beautiful appearance. | Clean and Easy Installed high Efficiency 5 Ton Steam Gas Diesel Boiler: |
Other Boilers
Our Services 1. 100% safety, running stably, excellent water level and pressure control, fully automatic operation. 2. Boiler running life > 20years.
3. Good after-sale service. It is free for you to get the damaged spares in warranty period (1 year) if there is any questions. Assure that we can supply you spares in boiler’s all life.
4. We can arrange engineer to your company for installation and commissioning and training. If you need us at any time, we can send our technicians and prepare in a short time.
5. Special paint is used after assembly. Paint is particularly used in your climate area, which is anti-corrosion, anti-abrasion and color-fastness. 6. Comprehensive after-sales service. We can design layout drawings of boiler system according to your actual requirement.Also can dispatch engineer to guide installation & commissioning. Packaging & Shipping
About Us
-------------------------------------Click Here to Learn Our Strength-------------------------------------------
FAQ Q: Are you manufacturer? A: Yes, we are manufacturer. Our factory is in Pingdu Qingdao. Q: Can I get guarantee of products? A: Yes, every product is 1 year quality warranty under customer correct using the products. Q: Do you have any Certificate? A: Yes. Each of our boiler has China GB certificate. If you need CE ASME or AS, we can help you to get it. Q: How can I pay you? A: T/T, L/C is very well used. Q: What about the production? A: Produce time is 20~25days for <6Ton boiler, 25~40days for >8Ton boiler. Q: Could you offer some wear parts? A: Yes, some chain grate bars, electric equipments in control panel box for example. Q: What about the maintenance? A: I will offer you the timely maintenance way sheet after installation of the boiler mainly parts. Contact us
If you are interested in our product, please feel free to contact us!