Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation
Chromite Ore Processing Plant For Chrome Beneficiation

1 / 5

Chromite Ore Processing Plant For Chrome Beneficiation

Get Latest Price
Send Inquiry
Model No. : 600TPD
Brand Name : Mingyuan
Certification : Other
Type : Gravity Separator
Customized : Customized
Color : Multi Color
Warranty : 1 Year
Energy Saving : Energy Saving
Material Feature : Heat Resistant
Material : Carbon Steel
Weight : >10T
Voltage : 380V
Condition : New
Applicable Material : Chrome, Tin, Hematite, Placer Gold
Spiral Chute Model : 1200mm
Shaking Table Model : 6-S
Ball Mill Power : 245KW
Shaking Table Power : 1.1KW
Optional Capacity : 100, 300, 500TPD
Spiral Classifier : 1500x9000mm
Slurry Pump : 45KW
Capacity : 30 TPH
Ball Mill : 2400x4500
More
6yrs

Zhengzhou, Henan, China

Visit The Store
  • Platform Certification

Product description

Chromite Ore Processing Plant is a Chromite Mining Process that recovers the chromite from its ore, It's a gravity chrome beneficiation plant for chrome concent enrichment, and it has been proven that the gravity method is an effective solution for the chromite separation. sometimes the chromite is liberated at about 6.4mm, then a jig machine can be used for separating the chromite content, and sometimes the chrome is liberated at less than 150 mesh, then the chromie ore needs to be crushed for further separation, then gravity spiral chutes and shaking tables can make it the chrome content to 32-46%, the grade is different for different specifications of the chromite ore, and Mingyuan Heavy Equipment can provide the complete solution for the chromite Ore Processing Plant.

Chrome Ore Processing Plant or Chrome Beneficiation Plant is a mineral processing process with gravity solution, as the gravity of the chromite is heavy than the other impurities, so it is an effective and environmental protection solution to concentrate the chrome ore.the main process includes three units: crushing---grinding and classifying---coarse washing and fine washing, after the fine washing, we can recover the chrome concentrate, we can get the dry chrome concentrate once the wet concentrate goes through the filter press and rotary dryer.


Process of the chrome ore processing plant /chromite mining process

1: First the chrome ore needs to be crushed with primary crusher and secondary crusher to reduce the sizes suitable for the feeding size of the ball mill, the primary crusher is jaw crusher PE400×600, and the seconary crusher is PEX 250×1000, after crushing and screening, the required sizes are conveyed to the hopper before the ball mill

2:  there is an electromagnetic feeder under the hopper which is used to feed the chromite ore to the ball mill for grinding, after discharging from the ball mill, the slurry flows to the spiral classifier for classifying purpose, the oversizes particles will returned to the ball mill for regrinding. 

3: the required sizes will be pumped to the spiral chute for coarse separation and to the shaking table for fine separation, we can get the chrome concentrate from the shaking tables.

4: finally the wet chrome concentrate goes to the filter press and the rotary dryer, the dry chrome power is produced.

Primary crusher for process of the chrome ore processing plant /chromite mining process

model

opening(mm)

max feed

 size (mm)

discharge

range (mm)

Capacity

 (t/h)

speed

(r/min)

Power

 (kw)

weigh

(kg)

PE-150

150*250

125

15-45

1.7-5.6

285

5.5

1000

PE-200

200*300

180

20-50

3.5-13.5

285

11

1500

PE-250

250*400

210

20-60

5-22

300

15

2800

PE-400

400*600

340

40-80

18-60

275

30

7000

PE-500

500*750

425

50-100

43-102

275

55

13500

PE-600

600*900

500

65-180

51-145

250

75

19200

PE-750

750*1060

630

80-180

122-223

250

110

29000

PE-900

900*1200

780

95-180

285-430

200

132

45000

PE-1000

1000*1200

850

195-280

320-470

200

132

51000

PE-1200

200*1500

1020

150-300

425-765

180

160

100900

PEX-150

150*750

120

18-48

8.5-28

8.5-28

15

3500

PEX-250

250*750

210

25-60

22-60

22-60

22

5500

PEX-250

250*1000

210

25-60

25-65

25-65

30

7000

PEX-250

250*1200

210

25-60

30-78

30-78

37

8200

PEX-300

300*1300

250

20-90

45-110

45-110

75

12000



Ball Mill used for Process of the chromite ore processing plant /chromite mining process


Model

Speed
(r/min)

Ball Load
(t)

Feeding Size
(mm)

Discharging Size
(mm)

Capacity
(t/h)

Power
(KW)

Weight
(T)

Φ 900×1800

38

1.5

≤ 20

0.075 -0.89

0.65-2

18.5

3.6

Φ 900×2100

38

1.3-1.4

≤ 15

0.075 -0.83

0.7-3.5

18.5

3.9

Φ 900×3000

38

2.7

≤ 20

0.075 -0.89

1.1-3.5

22

4.5

Φ 1200×2400

32

3.8

≤ 25

0.0745-0.6

1.5-4.8

30

11.5

Φ 1200×2800

32

3.3-3.5

≤ 25

0.0745-0.6

2-6

30

13

Φ 1200×4500

32

7

≤ 25

0.074 -0.4

1.6-5.8

45

13.8

Φ 1500×3000

27

8

≤ 25

0.074 -0.4

2-5

75

17

Φ 1500×3500

27

6.75

≤ 25

0.075 -0.4

3-7

75

17.5

Φ 1500×4500

27

14

≤ 25

0.074 -0.4

3.5-12

110

21

Φ 1500×5700

27

15

≤ 25

0.074 -0.4

3.5-8

115

24.7

Φ 1830×3000

24

18

≤ 25

0.074 -0.4

4-10

130

28

Φ 1800×3600

24

10.6-11.35

≤ 25

0.075 -0.4

5-22

130

33.5

Φ 1830×7000

24

25

≤ 25

0.074 -0.4

7.5-17

210

36

Φ 2100×3600

22

14-15.2

≤ 25

0.075 -0.4

15-36

370

46.8

Φ 2200×5500

21

30

≤ 25

0.074 -0.4

10-20

210

48.5

Φ 2200×6500

21

31

≤ 25

0.074 -0.4

14-26

380

52.8

Φ 2200×7500

21

33

≤ 25

0.074 -0.4

16-29

380

56

Φ 2400×3000

20.6

15.5

≤ 25

0.075 -0.4

22-24

245

59

Φ 2400×4500

21

30

≤ 25

0.074 -0.4

8.5-60

380

65

Φ 2700×3600

20.6

39

≤ 25

0.074 -0.4

12-70

400

91.3

Φ 2700×4000

20.7

40

≤ 25

0.074 -0.4

12-80

400

94

Φ 2700×4500

20.7

48

≤ 25

0.074 -0.4

12-90

430

102


Spiral Chute that serves for the chromite ore processing plant / Chromite Mining Process


Spiral Diameter(mm) 2000 1500 1200 900 600 400
Spiral Pitch(mm) 1200 720/540 900/720 /540 675/540 /405 450/360 /270 240/180
Ratio of
Pitch To Diameter
0.6 0.48/0.36 0.75/0.6 /0.45 0.75/0.6 /0.45 0.75/0.6 /0.45 0.6/0.45
Lateral  Obliquity
Starts 3 4 4 4 2 2
Feeding Sizes(mm) 2.00-0.04 0.8-0.037 0.3-0.03 0.3-0.03 0.2-0.02 0.2-0.02
Feeding Density (%) 30-55 30-60 25-35 25-55 25-55 25-55
Capacity(t/h) 7-10 6-8 4-6 2-3 0.4-0.8 0.15-0.2
Dimension
(mm)
Length 2120 1600 1360 1060 700 460
Width 2120 1600 1360 1060 700 460
Height 5600 5300 5230 4000 2600 1500
Weight (kg ) 900 800 600 400 150 50

Shaking table that serves for the chrome ore processing plant /chromite mining process

Name
Unit
Grit concentrating table
Fine sand concentrating table
Sludge concentrating table
Dimensions
Length
MM
4450
4450
4450
Driving part width
MM
1855
1855
1855
Concentrate part width
MM
1546
1546
1546
Max. feeding size
MM
2
0.5
0.15
Feeding amount
T/d
30-60
10-20
15-25
Feeding thickness
%
25-30
20-25
15-25
Journey
Mm
16-22
11-16
8-16
Frequency
F
15-48
48-53
50-57
Water quantity
T/d
80-150
30-60
10-17
Horizontal obliquity
Degree
2.5-4.5
1.5-3.5
1-2
Portrait obliquity
%
1.4
0.92
-----
Table board corner
Degree
32-42
40
42
Concentrating square
----
7.6
7.6
7.6
Table board length ratio
----
2.6
2.6
2.6
 Chromite Mining Process

 chromite ore processing plant


What we can provide for the chromite ore processing plant /chromite mining process


  1. Mineral tests for choosing the most effective solution
  2.  Equipment selection for each process
  3.   Equipment production and quality inspection
  4.  Foundation drawings for each equipment
  5. Timely deliery and installation guidance overseas.
  6.  Commissionng and trainning for the whole chrome processing plant
  7. Long term spare parts supply.

 Chromite Mining Process

 chromite ore processing plant



Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628