Changing Mat for Babies with Heavy-duty Cotton, Durable Outside and Insulated Inside
Changing Mat for Babies with Heavy-duty Cotton, Durable Outside and Insulated Inside
Changing Mat for Babies with Heavy-duty Cotton, Durable Outside and Insulated Inside

1 / 1

Changing Mat for Babies with Heavy-duty Cotton, Durable Outside and Insulated Inside

Get Latest Price
Send Inquiry
Model No. : Baby changing mats -X001
Brand Name :
10yrs

Jinjiang, Fujian, China

Visit The Store
  • Online Expo

Product description

  • Features:
    • Durable outside and insulated inside
    • Material is absolutely eco-friendly
    • Heavy-duty material and excellent sewing workmanship fordurability
    • Usage: baby
    • With changing mattress
    • ODM and OEM services are provided
    • Material: heavy-duty cotton
    • Customized sizes and colors are accepted
    • MOQ: 1,000 pieces
    • Filling: no
    • Weight: 0.3kg/piece
    • Azo-free acceptable
    • Low cadmium acceptable
    • Production time: 30 to 45 days after the order isconfirmed
    • Sample time: 7 days
  • Shipping terms:
    • Sample lead time: 4 to 6 days (without logo printing), 5 to 7days (with logo printing)
    • Production time: 30 to 45days (depends on the quantity) afteradvanced payment received
    • Packing: each into individual polybag, packing into exportcarton
  • Quality inspection:
    • All bags must have been inspected 5 times before delivery
    • Checking the raw material after they arrived our factory
    • Checking the swatches after cutting by mold
    • Checking all the details while the production lineoperated
    • Checking the goods after they are finished
    • Checking all the goods after they are packed
  • Durable outside and insulated inside
  • Material is absolutely eco-friendly
  • Heavy-duty material and excellent sewing workmanship fordurability
  • Usage: baby
  • With changing mattress
  • ODM and OEM services are provided
  • Material: heavy-duty cotton
  • Customized sizes and colors are accepted
  • MOQ: 1,000 pieces
  • Filling: no
  • Weight: 0.3kg/piece
  • Azo-free acceptable
  • Low cadmium acceptable
  • Production time: 30 to 45 days after the order isconfirmed
  • Sample time: 7 days
  • Sample lead time: 4 to 6 days (without logo printing), 5 to 7days (with logo printing)
  • Production time: 30 to 45days (depends on the quantity) afteradvanced payment received
  • Packing: each into individual polybag, packing into exportcarton
  • All bags must have been inspected 5 times before delivery
  • Checking the raw material after they arrived our factory
  • Checking the swatches after cutting by mold
  • Checking all the details while the production lineoperated
  • Checking the goods after they are finished
  • Checking all the goods after they are packed
  • Send Inquiry

    Product Alert

    Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

    版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628