casting forging wheel hub
casting forging wheel hub
casting forging wheel hub

1 / 1

casting forging wheel hub

Get Latest Price
Send Inquiry
Model No. : LD-wheel hub
Brand Name : Longda

Product description

Casting Forging Wheel Hub Detail Information: 1).  All the casting parts need precision after casting,the process of casting including sand casting and then precison casting. 2).   The casting equipment: CNC milling and turning machine, Lathe, Forging hammer, drilling tapping, grinding and polishing machine, etc. 3).   The casting requirement according to your casting samples or drawing. 4).   Facing Method :Raw materials manufacturing, rust prevent, ting oil, spray paint, hot galvanization, cold galvanization  or colored eletroplate, powder coating and so on.  5).   Quality Approvals: all casting machining part are subjected to 3 phases of thorough inspection using qualified instrument before dispatching. Table of casting material:
Ductile iron
European standard German standard
EN 1563 DIN 1693
EN-GJS-350-22-LT GGG-35.3
EN-GJS-400-18-LT GGG-40.3
EN-GJS-400-15 GGG-40
EN-GJS-450-10  
EN-GJS-500-7 GGG-50
EN-GJS-600-3 GGG-60
EN-GJS-700-2 GGG-70
EN-GJS-800-2 GGG-80
Compacted graphite iron
Grey cast iron
European standard German standard
EN 1561 DIN 1691
EN-GJL-200 GG-20
EN-GJL-250 GG-25
EN-GJL-300 GG-30
EN-GJL-350 GG-35
  Process Flow Chart: Our Slogan: regarding the quality as the factory's life We are: 1. Real factory with about 20 year’s history and are licensed to export, providing competitive price. 2. Factory with about 200 workers and 40 seniors, equipped with CNC milling and turning machines, CNC Lathes, etc. 3.Quality Certificates:  ISO9001-2000, ISO9001-2008 Quality Assurance System, the USA UL. 4. Products covering hydraulic cylinders, pistons, flanges, valves parts, casting and forging parts, engineering goods, etc. 5.  Quality control following 3 phases of thorough inspection, first-off inspection, during-processing inspection, and 100% inspection one by one before dispatching. 6.  MOQ: 10pcs. Production capacity: 100000pcs/month 7.  The way of payment: 30% deposit by T/T in advance, balance T/T before shipment, L/C is negotiable 8.  Delivery Time: about 20 days by the sea transportation. 9.  The sea port of the shipment: Beilun Ningbo Zhejiang province.
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628