1 / 1
Model No. : | GTL-90w-02A |
---|
Product description
CRI | Ra>70 |
---|---|
Beam angle | 130° |
Color Temperature | 5500-6500K |
Luminous flux | >7650lm |
Voltage | AC100-240v/50-60Hz |
Material | Aluminum, PC |
IP | IP65 |
Voltage | 110-220V |
Light Source | LED |
1.Quality assurance: each procedure should through spot check,and all products accept at least 5 kind of test
2.Price advantage: the direct manufacturer,has cooperated with the famous trading company and wholesale at home and abroad.
3.Good strength: our company owned 50,000 square meters work shop , world class photoelectric laboratory and R&D center ,introduced international top level production equipment from Japan, Germany .
4.Profession export service: we are a very profession export team, we will provide our best service for all our clients. What we do more than we can say!
Alunminum led 90W/120W/160W/200W Light In The Tunnel
Key information of GTL-90w-02A Light In The Tunnel
LED type: Epistar
Energy Saving LED Tunnel Lamp
Rated power:90W
Input voltage:AC100-240V/50-60HZ
LED quantity:1.5Wx60pcs
Luminous efficiency:85Lm/W
Luminaire flus:7650Lm
Beam angle:130°
Related color temperature:5500-6500k
Material:Aluminum alloy+Optical transparent PC
IP: IP65
Features:
1.Only 50% energy consumption compared to traditional tunnel light.
2.High luminous efficiency and uniform light output.
3.Constant current driving design
4.Extra-long lift 35000Hrs and low maintenance cost.
5.No glare or frequent flashes.
6.Environmental friendly.
Contact with US:
Note:
Trade Terms:
1. Payment Terms: 30% T/T in advance as deposit, the balance before delivery
2. Lead time: normally in 5~10 days after deposit received
3. Sample policy: Samples are always available for each model. Samples can be ready in 3~7 days once payment received. And we aslo can make the sample test according clients request.
4. Shipping port: Shanghai, Ningbo China
Delivery detail:
We ship goods by UPS/DHL/FEDEX/TNT express which takes 3~ 5 days to arrive, or by air cargo which takes about one week to arrive , or by sea which takes about one month to arrive , depending on your actual requirements.
Payment Terms | L/C, T/T, Others |
---|---|
Minimum Order | 100 |
Lead Time / Delivery Time | 20 Day(s) |
Sample Available | YES |
Delivery Details | 30% deposit before production, balance against Copy B/L or 100% L/C at sight |
FOB Port | Ningbo |
Loading Info | By sea , by air,by express |
Packing Info | 1 pc / carton |
Target Market(s) | North America, Southeast Asia, Eastern Europe, Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia |
Send your inquiry to this supplier