2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory
2016 new style metal clothes storage cabinet,used steel locker factory

1 / 6

2016 new style metal clothes storage cabinet,used steel locker factory

Get Latest Price
Send Inquiry
Model No. : SD-161011-2
Brand Name : Shenghua

Product description

Product Description 2016 new style metal clothes storage cabinet,used steel locker factory
Name 
2016 new style metal clothes storage cabinet,used steel locker factory
Model
SD-161011-2
Brand
Shenghua
Certification
ISO9001, ISO 14001 and GB/T28001 
Material
Metal cold rolling steel
Surface treatment
Durable powder coating
Structure
Knock-down
Thickness
0.5-1.5mm
Color
White, red, blue etc
Dimension
H1800*W850*D420mm
OEM/ODM
Available
Sample
Available
Lock
Any lock available
Product Show More product Factory Show Certifications Product Flow Following is the brief introduction about our prduction process
Cutting:
According to the design-drawings, the steel sheets(open and flat) are cut into different sizes by the high-accurated machines, without errors or burrs.
Pressing:
The CNC machine tools and other machine tools work with the big-scale moulds together to reach the required standard and cooperate with the flow line production, which assure the production efficiency and quality
Bending:
Skilled workers and advanced facilities make sure the clear lines and perfect appearance
Welding:
Locate the work pieces into the corresponding mould, firmly weldwith CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
Coating:  All the sheet material parts will go through 13 treatments of water cleaning, acid-ashing, phosphating etc. The imported automatic spray facilities and top-quality powder promise the coating to be flat and smooth, non-toxic and no smell
Installation:
To ensure the firmness of every screw, the installation workshop adopts pneumatic tools to conduct mass and flowline production
Packing and Shipping
Packing
1 PC/CTN with polyfoam inner lining and multi-layer carton box
Packing Volume
0.131cbm
Container Loading
191pcs/20"GP 420pcs/40"GP
Production Lead Time
2-4 weeks
Port
Qingdao
Our Sercive - What's your guarantee?
15 years for main structure and 5 years for parts.
-What's the loadability of steel plate?
70 kg
-What's the packing of products?
Polyfoam inner lining and multi-layer carton box.
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628