Company Information Taizhou Huangyan Chenhang Mould Factory, established in the year of 2004, is a professional company engaged in mould design, manufacturing & producing. We are specialized in plastic mould, injection mould, commodity mould, kitchenware mould, auto and motorcycle parts mould, SMC moulds,etc. We had introduced High Speed CNC Centre, Slow-feeding NC wire cut machine, Deep hole drilling machine,EDM, Wire cutting machine, Grinding machine, Latheing machine etc, all these advanced equipments ensure good quality moulds with short delivery.
Product Description
Product Name | 2015 New Products plastic bathroom basket mould |
Product material | PP |
Core& Cavity Steel | 718H |
Steel hardness: | HRC34-38 |
Mould Base | 45# |
Cavity Number | ONE |
Injection System | Pin gate, hot runner |
Ejector System | Ejector plate |
Cycle Time | 25 second/shot |
Tooling lead time | 50 days |
Mould life | 800, 000 times |
|
|
Our Advantage | 1. We are moulds manufacturers |
2. Competitive price |
3. High mould quality with guaranteed |
4. On time delivery |
5. Strict quality control |
6. All the mould produced follow on customers’ requirements |
|
Offer you | Professional & detailed response |
In time complete quotation |
Professional and integrity designs & drawings Mold flow analysis report |
Once a week mould process machining |
In-time mould test and sample delivery |
|
Our Services Chenhang Mould Quality Control 1.Mould Material Q/C 1) mould steel checking (hardness,flaw detection) 2) mould spare parts checking (hardness,size) 2.Mould Making Process Q/C 1) design checking ( part design,mould desig,mould enginering drawing) 2) mould size checking (according to drawing) 3) mould testing (check mould working,sample)
Packaging & Shipping
Packaging Detail | The moulds covered with anticorrosive oil inside and plastic film outside. Final packed in wooden case.Or we can follow you to make your own special package |
Delivery Detail | 55 days ( 40 days mold finished then free 3 times to test mold ) |
FAQ Chenhang Mould Operating Steps 1.Unscrew the bolt to take down the Connection Block. 2.The cooling channel connected by Diffluent Block.
Contact Us Our location on map
The time cost from other city 1.From Ningbo by train take around 1 hour. 2.From Yiwu by bus take around 3 hours. 3.From Shanghai by train take around 4 hours. 4.From Guangzhou by airplane take around 2 hours. Please feel free to contact with us if you have any inquiry for Plastic Injection mould . Thank you !