2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc

1 / 4

2014 New 32W SAMSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc

Get Latest Price
Send Inquiry
Model No. : YHDL-T8Y32A10-S-2
Brand Name :

Product description

  • Product Details

Basic Specification

LEDS SAMSUNG5630/ 30PCS
LED BRAND SAMSUNG
LUMEN 900LM
Power Factor 0.9
Item name 12W 60cm T8 LED tube SAMSUNG5630 Bra
Power 32
Life 30000hrs
Package Yes
Light Source Chip SAMSUNG
Tube Diameter T8
Lamp Base G13
Voltage 90-260V
Illuminant SMD
Length 150cm
Color Tones Pure White

Detail Description

32W SANSUNG LED tube lamp with CE/ROHS/EUP/FCC/SAA etc
Detailed Product Description

Model No. 

:

YHDL-T8Y32A10-S

Volt(V) 

:

AC85-265V 

Watt(W) 

:

32w

LED Quantity 

 

96PCS

Beam Angle 

:

120°

 Standard 

 

 CE/ROHS/EUP/FCC/SAA etc.

Color Temperature 

:

2700-3000K

4000-4500K

6000-6500K

Power Factor 

:

≥0.9

Lifetime (Light Source) 

:

≥50,000hrs

Dimension (mm) 

:

T8*1500mm

Our tube has below major features:

1. High brightness, using 96 grain, Samsung 5630 SMD LED.

2. Energy saving, driven by high efficiency constant current than traditional energy-saving fluorescent 80%.

3. Low energy consumption can reach 30,000 hours.

4. Strong weather ability, not sensitive to temperature, moisture to the wider

5. it\'s simple-designed and easy to use.

6. good for environmental protection, because of not heavy metals and harmful gas.

7. No glimmered, protection to your eyes.

Dimension:

 

 

Product Details:

 

 

Our factory:

 

How to install:

One: three wiring methods for single lamp installation

Two: Two optional methods for lamps\' wiring connection.

 

Connection:

 

1. Turn off the power supply before installation.

 

2. Remove the fixture.

 

3. Install the working tube with bracket.

 

4. Don’t touch the two metals pins when installation.

 

 

 

 

 How to packing:

 

 

 

Our advantages:

 

1) Self-owned factory and stable production capacity reaching 300,000pcs per month
2) standards comply with international standards and also know different markets quite well.
3) Experienced technicians and powerful R&D team
4) Prompt delivery time and long-time (16-18months) after-sales guarantee
5) Small MOQ (1000pcs~3000pcs is acceptable) for energy saving lamps and 100-300pcs for LED lamps.

 

The situation of Fair we take part in:

 

Our Certificates:

 

Our partner:

LED Application:

 

Additional Information

Payment Terms L/C, T/T, Others
Minimum Order 300
Lead Time / Delivery Time 35 Day(s)
Sample Available YES
Delivery Details Sample making time: 7daysLead time:35 days after reciept of deposit.Payments terms: 30% deposit before production.Balance before shippment or Irrevocable L/C at sight.The above quote valid for 6
FOB Port Xiamen
Loading Info sea shipping or air freight
Packing Info Size: 44X35X600 mmQty/Carton: 10pcsPackaging Details: paper tube/customized packing
Target Market(s) North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia, Middle East
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628