QTZ250 7030 engineering machinery

1.Performance parameters of QTZ7030-16T: performance parameters and technical indexes reach both domestic and international advanced level.

• Max. jib length: 70m; Jib length under different assembling modes can decrease progressively by 5 meters and the Min. jib length is 50 meters.

• Max. lifting capacity 16t;

• Max. hoisting capacity at jib tip: 3t;

• Max. lifting moment 2500t.m;

• Max. free-standing height: 60m; Max. working height of anchored crane: 216m;

• Hoisting mechanism power: 60 kW; rope capacity: 600m;

• Slewing mechanism power: 2×7.5KW

• Trolleying mechanism: BP110A; power: 11 kW

• Types of Tower Crane: stationary crane with embedded outriggers, stationary crane with embedded bolts, stationary crane with under-frame and mobile tower crane.

2. Electrical control system

With PLC control, the electrical control system enjoys better reliability and safety. Produced by professional manufacturers with advanced foreign technology, the electrical elements feature service lives that are 3 or 4 times longer than that of domestic products, less faults, easy maintenance and repair as well as reliable operation.

3. Technical features

• The crane boasts of multiple operation modes and wide application. The crane can work in different forms: stationary crane with embedded outriggers, stationary crane with under-frame, stationary crane with embedded bolts and crane anchored to wall, thus being applicable to various construction projects.

• The complete machine adopts internationally well-received beautiful shape;

• The crane features high working speed and excellent speed regulation performance. Stepless speed regulation by frequency control, the world's most advanced solution, is adopted for the trolleying mechanism and slewing mechanism, thus ensuring more stable and reliable operation ;

• The cab is independently installed externally with good vision and large inner space, thus offering a good working environment for operators;

• A variety of safety devices are equipped, which are all mechanical or mechatronic products that are applicable to severe working conditions, so as to ensure the tower crane's reliable operation.


Rated hoisting moment (kN.m)

2500

Lifting height (m)

 Rope fall

Free-standing stationary crane

Anchored crane

α=2

60

216

α=4

60

108

Working radius (m)

Max. working radius

70

Min. working radius

3.5

Max. lifting capacity (t)

16

Hoisting mechanism

 Rope fall

α=2

α=4

Speed (m/min)

37.5

75

18.75

37.5

Lifting weight (t)

8

4

16

8

Power (kW)

60

Traction mechanism

Speed (m/min)

0~100

Power (kW)

11

Slewing mechanism

Speed (r/min)

0~0.6

Power (kW)

7.5×2



Our company customize large tower crane



QTZ250 7030 engineering machinery

 engineering machineryHammerhead Tower CraneMetro Topless Tower CraneBridge Topless Tower CraneBridge Topless Tower Crane for SaleBridge Topless Tower Crane price
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628