High-quality high-speed foot cutting machine
High-quality high-speed foot cutting machine
High-quality high-speed foot cutting machine

1 / 1

High-quality high-speed foot cutting machine

Get Latest Price
Send Inquiry
Model No. : MJ-C250
Brand Name : maijie
3yrs

Shenzhen, Guangdong, China

Visit The Store
  • Platform Certification

Product description

High-quality high-speed foot cutting machine


Model: MJ-C250
Substrate size: Max 250mm
Power/Voltage: 550W/220V
Dimensions: 1200*600*800mm
Machine side plate: iron plate thickness 1.5mm
Blade size: inner diameter 70/outer diameter 200/250mm
Blade spindle yaw: within 0.02mm
PCB track: steel plating track
Knife shaft speed: 4300r/min
Working decibel: below 80-90 decibels

High-quality high-speed foot cutting machine

1.5mm thick iron plate body
The side plate of the machine is iron plate, the thickness is 1.5mm, the whole machine is stable, low jitter, and low noise

blade
Round knife blade, 8 inch blade can be installed, the shortest cutting foot can be 1.0mm, suitable for small quantities

High-quality bearings
Linear cutting, the blade jitter is only about 0.02mm when working, cutting the feet more accurately

Hand putter
The hand push rod adopts linear axis to slide, which is more stable during work, improves work efficiency and prolongs the service life of the machine

Steel rail
The feeding PCB track is specially treated (steel plating track), wear-resistant and durable


1

2

Workshop shots

3

Item display

4

About delivery
All the equipment of the company includes freight and distribution fees, excluding the cost of going upstairs, depending on the distance, choose logistics consignment or door-to-door delivery
On-site installation and commissioning
The company is responsible for distribution, and there are professional engineers on-site installation, commissioning, training, or guidance and assistance through remote video or telephone
1 year warranty
After-sales promises that all parts of the wave soldering machine are guaranteed for one year, except for human problems
Lifetime service
The company provides life-long maintenance, paid service, only labor costs and material costs



Preparation before installation and commissioning
1. Door-to-door time: within 2 working days after all the following work is ready, special circumstances will be discussed separately
2. Logistics transportation: After receiving the goods, customers who choose logistics transportation must first place the equipment and prepare all the following materials
3. Home delivery: Customers who choose home delivery need to reserve space in advance to prevent equipment and prepare all the following materials
Material preparation:
1. Power connection: lead the power cord to the device according to the requirements of the device, leaving a length of more than 3 meters to connect to the device
2. Air connection: If there is an air source in the workshop, lead the air pipe to the side of the equipment, leaving a length of more than 3 meters to connect to the equipment. If there is no air source in the workshop, you need to prepare the air compressor in advance and prepare the necessary accessories
3. Tin bar: Prepare enough tin bars in advance according to the tin capacity requirements of the equipment, so that the master can directly melt the tin for on-site trial welding test and training when he comes to the door.
4. Flux: the flux that needs to be used when the product is ready for trial welding. At least 2 liters required for testing
5. Cleaning agent: the nozzle used to clean the flux, temporarily not used, it will not affect the debugging

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628