DN20 Thread connection rubber joint
DN20 Thread connection rubber joint
DN20 Thread connection rubber joint

1 / 1

DN20 Thread connection rubber joint

Get Latest Price
Send Inquiry
Model No. : JGD-B
Brand Name : Liangda

Product description

Product Description   Features   Specifications    

Item

Parts

Material

1

Tube

NBR/EPDM/Hypalon

2

Threaded Union

Ductile Iron/Carbon Steel/SS304/SS316

3

Support Ring

Mild Steel

4

Carcass

Nylon Layers

Date Sheet: 

SIZE

I.D

LENGTH

F/F

MAX

Pressure

VACUUM

Rating

Movement Capability(mm)

Prox.

Weight

Comp.

Ext.

Lateral

Angular

Torsional

(mm)

(mm)

(bar)

(mm Hg)

(mm)

(mm)

(mm)

(degree)

(degree)

(kg)

15

200

20

760

22

6

22

45°

5

0.6

20

200

20

760

22

6

22

45°

4.8

0.8

25

200

20

760

22

6

22

45°

4.5

1.2

32

200

20

760

22

6

22

45°

4

1.4

40

200

20

700

22

6

22

45°

3.8

1.5

50

200

20

700

22

6

22

45°

3.2

2.6

65

265

20

700

24

10

24

45°

3

4.0

80

280

20

700

24

10

24

45°

3

5.5

 
Packaging & Shipping          1. Ductile iron and SUS304 threaded unions GYLDT has in stock, other materials available upon request.          2. Other bellows material available, contact GYLDT for prices.          3. Hypalon/NR is Hypalon covered NR tubes.          4. Normal threaded union standard is BSPT, NPT available upon request.   Our Services   Technical Support: what GYLDT can offer is not products only, contact GYLDT, you will get more than you expected. Production time of a 40’ container is 20 days for normal products. Customized products will take 15 days more. Deliver by air:By train: to part of Asian Countries and European Counties. Will take 2 days to Asian Countries; Will take 3 days to European Countries; Will take 4 days to Australia, North America, South America and Africa. By train: to part of Asian Countries and European Counties. To Hamburg, Germany will take 16 to 18 days; To Moscow, Russia will take 12 to 13 days; To Klaipeda, Lithuania will take 13 to 14 days; 6.  Deliver by sea: a)     Will take 10 days to Asian Countries. b)     Will take 30 days to European Countries; c)      Will take 45 days to Australia, North America, South America and Africa.    
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628