The No foundation needed HZS Stationary Concrete Plant, also referred to as the concrete mixing plant or concrete mixing station, is a comprehensive range of construction machines designed to produce different types of concrete. This stationary batching plant includes a horizontal twin-shaft compulsory concrete mixer, concrete batching machine, cement silo, screw conveyor, belt conveyor or skip hopper, and control room. It can produce plastic and dry hard concrete with a high production efficiency, short mixing time, and easy operation, without the need for a foundation. The No foundation needed HZS concrete batching plant is widely used in large and medium-sized building construction, road and bridge, and precast plants, making it an ideal plant for producing commercial concrete. Additionally, it is compatible with various types of concrete mixer machines, such as the diesel concrete mixer, concrete mixer diesel engine, diesel concrete mixer pump, planetary concrete mixer, hot sale concrete mixer, best concrete mixer, and volumetric mixer for sale.
The cement silo (cement tank) of the stationary concrete batching plant is composed of steel structure part of the silo body. ladder climbing, guardrail, feeding pipe dust remover pressure relief valve, high and low material level gauge, unloading valve, etc.
Control Room
After-Sales Service
◆ Guarantee time
All of the life time of SMART machine, free for the first 12 months except the wrong operation.
◆ Free Spare parts
SMART will prepare the one set spare parts and delivery them along with the machine.
SMART have the 12 workshops to produce every parts and we can produce spare parts to deliver them to you within 2 days.
Packing & Delivery
Raw Material
Some Questions You Care About
Q: What details should be paid attention to in the operation and construction of concrete mixing plant?
1. The operator of the concrete mixing plant must be certified. It is strictly forbidden to hand over the concrete machinery to undocumented personnel for operation. In the process of operation, pay attention to correct operation and do not leave the job without authorization.
2. Before the operation of the concrete mixing plant, check the clamps, clutches, brakes, pulleys, steel wire ropes, transmission dvices, upper limit of the hopper, electrical circuits, protective neutral or grounding wires, etc. Any abnormalities must be eliminated.
3. If there is a multi-shift system, the shift system should be implemented conscientiously and the work records after the shift should be kept.
4. The machinery must be used reasonably in accordance with the specified technical performance.
5. After the upper hopper is raised, it is strictly forbidden to enter under the hopper. When cleaning the lower part of the hopper, the safety chain must be hung. When someone enters the mixing drum for cleaning and maintenance, unplug the isolating switch in the switch box and lock the switch box to avoid injury caused by misoperation.
6. After the operation is completed, the machine should be cleaned up, the power supply should be cut off, and the switch box should be locked.
Q:How to improve the production efficiency of the concrete mixing plant?
1. According to the production capacity of the civil commercial concrete mixing station and the distance of the finished product transportation, line and road conditions, Equipped with a sufficient number of carriers, Generally 1.2 times the required productivity;
2.Factors affecting the productivity of concrete mixer equipment, In addition to the two direct factors of mixing time and time utilization factor. There are also some relevant factors, Such as production organization, management and operation quality of equipment, the technical condition of equipment operation, the preparation of raw materials and transportation vehicles also have an obvious role in ensuring and improving productivity;
3.Strengthen the maintenance and management of equipment in commercial concrete mixing station. Ensure that the equipment is in a good technical condition, and meets the requirements of the environmental protection law, establish a strict maintenance and testing system and preventive measures, do timely repair;
4.In order not to stop the commercial concrete mixing station equipment due to special reasons, there shall be a finished material storage warehouse with sufficient capacity;
FAQ:
Q: How about the quality of your products?
A: Our machines are manufactured strictly according to national and international standards, and we take a test on each equipment before delivery. Chinese top brands or world grade brands like Siemens motors etc are equiped.
Q: How about the price?
A: As a manufactory, we can give you lower price than trade companies.
Q: Do you provide after-sale service?
A: Yes. The warranty period of our machines is one year, and we have a professional after-sale service team to promptly and thoroughly solve your problems.It usually takes 1-3 days for training , 10-15 days for installation,1-2days for commission,1-2days for pre-operation.
Q: Do you provide equipment operation training?
A: Yes. We can send professional engineers to the working site for equipment installation, adjustment, and operation training.It’s about 90-120 usd a day.
Q: How long it takes to do all the installation
A: It’s at most 5days processing and manufacturing for single machine,for production line,at most 15days.
Q: Can we visit your factory?
A: Yes. You can visit our factory at anytime you want.