Specifications 1.excellent welding performance.
2.stable and smooth wire feed
3.rapid melting speed
4.high deposition efficiency
Submerged arc welding wire QF08MnA/GB H08MnA /AWS EM12/DIN S2 Feature and advantage 1. Stable welding quality
2.reliability, beautiful forming
3.large depth of fusion Chemical Composition of Welding Wire (%)
C | Mn | Si | P | S | Cr | Ni | Cu |
≤0.10 | 0.80-1.10 | ≤0.07 | ≤0.03 | ≤0.03 | ≤0.02 | ≤0.03 | ≤0.02 |
Mechanical Properties of Deposited Metal
Yield Strength | Tensile Strength | Elongation | AKV Impact |
≥320 | 410-550 | ≥22 | ≥34(0) |
Wide application The product is mainly used for welding low carbon steel and the important low alloy steel structures, such as pressure vessels, nuclear power plants, chemical containers, bridges and ships. Packaging white plastic spool +OEM / Neutral / Company Package black plastic spool+OEM / Neutral / Company Package 15kg/ carton, 72 cartons / pallet, total 1080kgs/ pallet, 20-23pallets/ 1×20′ FCL 5kg/ carton, 200cartons/ pallet, total 1000kgs/ pallet, 20-24pallets/ 1×20′ FCL 250kg/drum 4drums /pallet. 350kg /drum 2drums /pallet. The production line and equipment The company has modern standard workshop, complete CNC flexible production lines and advanced modern production equipment and an excellent design team. Every production line is composed of several sections such as rough drawing, finely drawing , Electroless copper plating , Wire winding and package, can produce products in different specification at the same time to meet market demands. First-class testing equipment and method We hold on the fine tradition and pay attention to the product quality , With First-class testing equipment and criterion , from materials purchase to sending the finished products out of warehouse, all operation procedures are inspected and controlled strictly, therefore the product quality is under a strong guarantee Superior to other suppliers: 1.production technology: latest 2.products self use life: longer than others 3.production equipment: advanced 4.Production lead time: within 15 days Certification
Test certificate:
Producing process (1).Pretreatment
(2). Drawbench
(3).Coppering
(4).Spooling Lines
(5). Packing