PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)
PPR tube couplers straight 90 elbow for water supply (cold and hot water)

1 / 6

PPR tube couplers straight 90 elbow for water supply (cold and hot water)

Get Latest Price
Send Inquiry
Model No. : DN20 - DN160
Brand Name :

Product description

Specifications PPR straight 90 elbow

1.Health, non-toxic, no rust, never scale formation.

2.High resistance of temperature and pressure.

PPR tube couplers straight 90 elbow for water supply (cold and hot water)   Application Fields     1. Building‘s hot and cold water systems, including the central heating system.     2. Building’s inner heating system, including the floor, wall panels and radiation heating system.     3. Pure water supply system which can be directly drinking.     4. The central (concentration) air conditioning system.     5. Transfer or discharge of chemical medium such as industrial piping system.   Product Features     1. Health, non-toxic, no rust, never scale formation.     2. High resistance of temperature and pressure.     3. Use hot melt to connect pipes, pipe fittings homogeneity, and safe, reliable and never leak.     4. Low thermal conductivity and heat preservation performance is good.     5. Light weight, easy handling, low construction strength.     6. Pipe wall smooth, small pressure loss, flow speed.     7. Has little pipeline transmission noise.     8. Product color is soft and has beautiful shape. It is suitable for both indoor installation and concealed installation.     9. Concealed installation issimple and easy, fast and low construction cost.     10. Service life is long, under normal conditions, the service life can reach more than 50 years.   Product performance

Items

Parameter

Density  g/cm  (20)

0.9

Elasticity Modulus 20 Mpa

800

Thermal Conductivity 20 w/m

0.24

Thermal Expansivity 1/K

1.5×10 -4

Vertical Retraction %

≤2

 

Charpy Impact Testing 0℃±2

<10%

 

Hydraulic Test

short period 20.1h cycle stress 16MPa

no leakage

no leakage

 short period 95.1000h cycle stress3.5MPa

no leakage

no leakage

    Product Picture   Construction Site   Installation Note     1. PP-R pipe has low hardness and poor rigidity compared with the metal pipe. It should be protected during transport and under construction to avoid mechanical damage caused by inappropriate external force. After hidden laying, we need to mark the pipe position in order to avoid the damage of the pipe in secondary decoration.       2. PP-R pipe has a certain brittleness at low temperature below 5 ℃ so you should be careful in winter construction. You should use sharp tools to cut the pipe slowly. Can’t heavy load or knock the installed pipes and it’s better to cover protection on the vulnerable external force area when necessary.       3. PP-R pipe is easy aging degradation with long-term exposure to ultraviolet radiation, so when installed in the outdoor or the direct sunlight place must bind up dark protective layer.     4. Inaddition to use screw thread insert or flange mechanical connection way when connected with metal pipe or water holder, the rest all should adopt hot melt connection, which can make the pipeline integration and has no leakage point.       5. The linear expansion coefficient of PP-R pipe (0.15mm/m℃) is bigger. We must take technical measures of preventing deformation of pipeline in open installation or non-straight tunnel hidden laying.       6. You must test the pressure after installed the pipes but before tube sealing (straight laying) and coverage layer (non-straight hidden laying). Cold water pipe test pressure is 1.5 times of the system working pressure but shall not be less than 1 MPa; hot water pipe test pressure is 2 times of the system working pressure but shall not be less than 1.5 MPa.       7. We must install in accordance with the holders, hangers when open laying or non-straight hidden laying the pipes.       8. Please cool to the prescribed time and then complete the connection.       If you have any questions, please feel free to contant me!
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628