1 / 4
Model No. : | QG |
---|
Product description
Alloy Model | 6063 |
---|---|
Surface Treatment | Natural Anodized |
Type | Thin Cylinder |
Body Material | Aluminum |
Standard Or Nonstandard | Standard |
Structure | General Cylinder |
Aluminium cylinder, alumininum hydraulic cylinder, aluminium gas cylinder,aluminium oxygen cylinder, aluminium alloy cylinder. Cosco cylinder tube uses high quality aluminium alloy, hard anodize inside finish and normal anodize outside finish. They have very good machiniability, abrasion resistance and corrosion resistance.Current cylinder tubes include:
|
available for your choice. Our advantages include: 1.Reliable quality (ISO9001:2008 & TS16949:2002 certified). 2.Competitive prices with short lead-time for both tooling and parts, because we do everything in-house. 3.Effective and strong technical support and excellent sales services. 4.Sufficient production capacity (only 65% occupied). 5.Efficient communication (48-hour quote lead time). 6.Compliant with RoHS Test. |
Aluminium Alloy Standard Thin Pneumatic Cylinder Pipe / Housing / Tube
Item Original Product Alternatives Shape Irregular Round, Square, Triangle, Rectangle etc...and Customized shapes are welcomed.Alloy6063 alloy6061,6082,6060,6005,6N01,5083,5056,3003,7005,7020 Alloy etc.Temper T5T3,T4,T5,T6,T8 can be discussed.Machining & FabricationNot requiredCutting, Shearing, Deburring, Tumbling, Punching, Drilling, Tapping, Chamfering, Cold-drawing, Honing, Bending, Stamping, Forming, Polishing, Grinding, Brushing, Sandblasting, Welding Numerical Control Lathing, Milling, Sophisticated CNC Precision MachiningFinishing PaintedMill finished, Anodized, Electrophoresis, Powder coated, Painted, Sliver matt, Sand blasted, PVDF, Silkscreened etc.Standard for ExtrusionGB /T5237-2000 EN-755-2/3/6/8, BS-1474, BS 1161 (British Standards) JIS H4100 (Japanese Standard) AS/NZS1866-1997 (Australian New Zealand Standard)Standard for FabricationGB/T1804-92BS 8118 TS1649Standard for AnodizingGB5237.2-2004BS1615:1987BS5599:1993Mil-A-8625E Type IMil-A-8625E Type III |
Order Details for Aluminium Alloy Pneumatic Cylinder Tube / Pipe / Housing 》 |
Item | Content |
Minimum Order | 300kg per trial order. One pc of sample free of charge provided by approval and kept for future mass production inspection, delivery fees on buyer. |
Production Capacity | 40,000MT/year |
Sample Lead time | 15-18 working days include 7-10days making tooling if it\'s necessary. |
Production lead time | 15~25 working days. |
Documents | Mill Certificates, RoHS, REACH(SVHC), Working Instructions, Inspection Instructions, Packing Instruction, PPAP (including Control Plan, PFMEA etc.), Unpacking/unloading Instructions for customers. |
Packing Method |
1.Standard packing: plastic sheet wrapped for each profile in order to protect the profiles\' surfaces, kraft paper wrapped in bundles.
2. Special packing: wooden cases + Iron trays.
3. Bundles or boxes with wooden bars.
4. EPE + carton boxes.
5. Customized packing methods are welcomed.
|
Loading Weight | 20\'GP for 13tons, 40\'GP for 20tons. LCL shipment will be acceptable. |
Payment term: |
Tooling:100% prepaid by wire transfer. Parts: 30% upon order confirmation and balance before delivery by T/T. Other payment terms can be discussed. |
Shipping Term: | FOB,CIF or others can be discussed. |
Reference price structure for Aluminium Pneumatic Cylinder Tube / Pipe / Housing 》 |
Remark: it\'s subject to detailed product and final confirmation, Cosco aluminium reserves the final explanation on the prices. 1. Alu. ingot price (Based on Nanhai lingtong aluminium price) 2. Smelting & extrusion cost (USD 700~950 per ton) 3. Machining(to be subject the detailed product,contact us for details) 4. Surface finishing(to be subject the profile and requirement) 4.1) clear anodizing: USD 200 ~380 per ton; 4.2) powder coating: USD 460 ~ 545 /ton; 5. Assembling(if there is) (Pls send us your design drawing so that we can let you know the assesssory cost and the packing method what you wanted.) 6. Packaging cost: seaworthy packaging, approx.USD 80 ~ 120 per ton. |
Look forward to meet you at our following trade fair
ALUMINIUM 2014, Messe Dusseldorf, Germany
Date:2014-10-07~09
Booth No.: Hall H12 No.12M20/17
Website:
2014
Date: 2014-10-10~13
Booth No.: 11M40
Website:
2014
Date: 2014-10-15~19
Location:
Website:http://www.cantonfair.org.cn/cn/
2014
Date: 2014-11-01~05
Location:
Website:http://www.cantonfair.org.cn/cn/
2015
Date: 2015-04-11~14
Booth No.: 9c42
Website: http://www.globalsources.com/
Please contact us for more details of Aluminium Alloy Standard Pneumatic Cylinder/ Tube / Pipe / Housing .
Contact Person: Sonya Zhang
Payment Terms | L/C, T/T, Others |
---|---|
Minimum Order | 500kg |
Lead Time / Delivery Time | 25 Day(s) |
Sample Available | YES |
Delivery Details | Tooling:AvailableSample Lead time: 15-18working days include 7-10 days making tooling if it\'s necessory.Production lead time: 25~35 working days. |
FOB Port | Guangzhou,Hong Kong,Jiangmen |
Loading Info | FOB,CIF or others can be discussed. |
Packing Info | 1.Standard packing:plastic sheet wrapped 2. Special packing: wooden cases+iron trays. 3. Bundles or box4. EPE+carton boxes. 5. Customized packing methods are welcomed. |
Target Market(s) | North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Middle East & South Asia, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia, Middle East |
Send your inquiry to this supplier