Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould
Automotive fog lamp plastic injection mould

Video

1 / 5

Automotive fog lamp plastic injection mould

  • $10000.00

    ≥1000 Piece/Pieces

Send Inquiry
Model No. : CT-10122
Brand Name : Ceeto
place of origin : China
Forming method : Plastic Injection Mould
product material : Plastic
product : Household Product
Shaping Mode : Injection Mould
Surface Finish Process : Polishing
Mould Cavity : Multi Cavity
Plastic Material : ABS
Process Combination Type : Single-Process Mode
Application : Car
Runner : Hot Runner
Design Software : Pro-E
Installation : Fixed
Certification : ISO
Standard : DME
Customized : Customized
More
6yrs

Ningbo, Zhejiang, China

Visit The Store
  • Gold Supplier
  • Platform Certification
  • Online Expo

Product description


Customized automotive front bumper fog lamp plastic injection mould, Ceeto molding has rich experience in design and manufacturing fog lamp plastic injection moulds for OEMs, yearly output moulds about 400 sets, and export plastic injection moulds all over the worlds.


Detailed Mould Description


  1. Part name: Automotive front bumper fog lamp plastic mould
  2. Mould cavity: 1+1 cavity
  3. Mould cavity and core steel: P20, 2738, 718, H13, NAK80, S136 etc.
  4. Mould base: LKM, HASCO, DME, PUNCH
  5. Hot runner system: Yudo, Synventive, HRS, etc.
  6. Mould life: can be 300000shots or 500000shots
  7. Plastic resin: ABS, PP, PC, PE
  8. Lead time: 55 days ( from mould design approval to the first shot )
  9. Surface treatment: mirror polishing
  10. Packing for mould: wooden box
  11. Packing for samples: cardboard box with wooden pallet if big quantities


Our processing

  1.  Samples or Drawings ( 2D and 3D ) and Technical Requirements are provided by customers 
  2.  Mould design: we will Communicate&Exchange the opinion with you after you place order
  3.  Material Purchase: Steel cutting and Mould base tooling.
  4.  Assembling and bed-out
  5.  Inspection of mould: following and controlling the tooling processing.
  6.  Mould testing: We will inform you T0 date by the weekly report, then will send the sample's inspection report and injection parameters with the samples
  7.  Customer approval for mould shipment
  8.  Mould packing in anti-rust way to be put into the wooden box

Machining equipment for Car fog lamp plastic mould


CNC manufacturing


CNC milling


EDM sparking machining


EDM machining


CMM measuring equipment


CMM quality control


Injection molding machine for testing


Injection molding machine


FAQ:


Q1: What tolerances can you achieve?


There is not a given set of tolerances that fits all processes and materials. In every case, the final tolerances on your part will depend on a number of factors, including but not limited to:

  • Part size
  • Design geometry
  • The number, type, and size of features
  • Material(s)
  • Surface finish
  • Manufacturing process

We will review your design and provide a design for manufacturing review, pointing out any areas where we may not be able to achieve your desired tolerances. It`s helpful to us if you can specify which areas in your design have critical tolerances that must be met and which can be slightly modified if needed to reduce time and costs involved.


Q2: How do you ensure your quality of Car fog lamp plastic injection mould?


In order to deliver high-quality parts every time, we've instituted the following steps to ensure you get parts that meet and exceed your expectation.  

  • A full design for manufacturing (DFM) review upon initial inquiry. This will be performed by our skilled engineering team, who will alert you to any issues before work begins.
  • All incoming material (metal and plastic) is 100% inspected using our in-house metrology equipment.
  • In-process and first article inspection.
  • Comprehensive final inspection with full report.
  •    

Q3: Is the lead time in working days or calendar days?


Lead times are quoted in working days. As per our terms and conditions, quoted lead times commence only after completion and confirmation of design for manufacturing review and the beginning of actual production.


Q4: How long does a quotation take?    

In most cases, we respond within a couple of days of receiving an RFQ. However, there may be situations when we must source material from an external supply and therefore the quotation may be delayed accordingly.


Q5: What is the difference between a multi-cavity mold and a family mold?


A multi-cavity mold has multiple cavities of the same part; a family mold produces a set. For instance, for an electronic enclosure, you may need a front, back, battery door, and a button. Those could all be molded at once in a family mold.


Video

Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628