1 / 5
Model No. : | HLW9401CGS |
---|---|
Brand Name : | FOMON |
Condition : | New |
Suizhou, Hubei, China
Product description
Performance and purpose
Items Data
1. Box Body Assembly
dimensions 12190x2438x2591mm frame 6mm carbon steel rectangular pipe
Standard configuration : a. Top and bottom material: pattern plate, side plate material: 1mm corrugated steel sheet
b. Movable rear ladder;
c. Three pieces aluminium alloy rolling shutter doors(front,both sides)
2. Tank Assembly
Tank volume 26000L Tank thickness 6mm
Top Manhole diameter 500mm, two sets(front and rear on top) Inner wave-proof plate thickness 3mm
Standard configuration : a. Outer tanker 8CM rock wool insulation layer(Used to isolate the outside temperature);
b. Filled explosion-proof barrier device, Sino Austrian joint venture (mesh type)
3. Oil machine assembly
Standard configuration : a. Filling machine and generator motor 380V power supply, Three phase 380V of the motor pump without electrical discharge, two refueling guns for two models of oil.
b. With connecting device for the main power supply.
c. Inside the room of filling machine with working table(explosion-proof distribution box).
4. Oil pump
model 60/30(Self-suction)
Standard configuration : a. Flow meter(can pump-in and pump-out),with relief valve;
b. with oil measuring hole on the top of the rear tanker
c. Seamless steel pipe, gas station dedicated hose, fire protection, high pressure resistance.
d. With float level gauge;
e. With one drain valve at the bottom of the tanker(2.5")
5. Explosion proof generator motor
Standard configuration : a. Non spark explosion proof generator motor
b. Three phase 380V, power is 5.5KW;
6. Pressure vacuum breathing valve
Standard configuration : a. Installed on the top of the tanker, used for reducing the inner pressure;
7. Fire Extinguisher
Standard configuration : a. 3 stes suspension type, temperature controlled ,ultrafine ,dry powder automatic fire extinguishing system, installed on the top between oil pump system and the filling machine(When fire occurs,thermal line will burn,the heat will be transferred to the fire extinguisher,the starter will work,glass ball will be bursted,then the nozzle is automatically opened,the fire extinguisher will work)
b. 4kg portable dry powder fire extinguisher (Extra spare)
8. Lighting lamp: Explosion proof lamp 2 sets
9. Painting: Anticorrosive paint for the surface of the tanker,inner surface of the container,outer surface othe container and all other parts which can be touched with air.
4, Roll-on/Roll-off ship or bulk truckgo ship is optional according to the customers` requirements.
5, some small truck part can be put into container according to its overall dimensions.
FAQ
1, How to purchase the LPG station from your company?
More semi trailer details, please kindly check Tractor Truck,Semi Trailer,Fuel Tank Truck,Chemical Liquid Truck,LPG Truck
Suizhou, Hubei, China
Send your inquiry to this supplier