1 / 1
Model No. : | 30A controller |
---|
Product description
Warranty | 12 months |
---|---|
System | PWM |
Color | Black |
Voltage | 12V, 24V |
Application | Charge, Solar System |
30A SOLAR POWER CONTROLLER(HBSC)
Product Introduction
CM series controller is a kind of intelligent, multi-purpose solar charge and discharge cotroller. The family use the fixed LCD display, with a very friendly interface; various control parameters can be flexibly set, fully meet your various application requirements. CM series controller has following features:
Image of LCD graphic symbol
Simple button operation
Sutomatic Identification System Voltage Level
Intelligent PWM charge mode
Automatic Temperature Compensation
Adjustable charge-discharge control parameters
Settable operating mode of load
Overload, short circuit protection
Remote monitoring and control function(custom)
Battery reverse-discharge protection
Battery low voltage disconnection(LVD)
Battery reverse connection protection
Accumulated function of charge and discharge ampere hours
Installation
Ready tools and cables. Encourage you to matching the right cables. Ensure that the current density <4mm² that is conductive to reducing the line voltage drop. Recommended: 30A with 10mm² cable. Check weather the installation sites compliance with the relevant safety requirements. Please avoid the damp, dusty, there is a place flammable, explosive and corrosive gases use the controller to install.
Install the controller nto a fixed vertical plane. See section 5 ofthe pore size and pore spacing. In order to ensure a good thermal control onditions, please set aside each 10cm below the controller space.
As shown on the right, connect the(1) Load, (2) Battery and (3) Solar Panel to the controller according to the order of (1) (2) (3). Pay attention to the load, battery, solar panel and controller of same polarity.
Put into the external temperature sensor on the left of the controller(probe port). The temperature sensor should be similar space with battery. ( otherwise, the controller will control the paramaters of all wrong temperature compensation.)
If you have remote monitoring and control function, please insert one end of the included communication wire on the right of the controller(communication port), the other end to connect to the host computer.
Demolition: To prevent accidents, please order the demolition of solar panels, battery and load disconnect with controller.
Note: Battery polarity will not damage the controller, but you will have a load equlpment security risks.
Payment Terms | T/T, Western Union |
---|---|
Minimum Order | 50 units |
Lead Time / Delivery Time | 7 Day(s) |
Sample Available | YES |
Delivery Details | Delivery time is based on your quantity, the quantity more, the time will long; 100% payment before we shipped |
FOB Port | Guangzhou |
Loading Info | By express company, like DHL, EMS, Fedex, TNT, UPS and so onBy special airwayBy Sea |
Packing Info | Size: 140*90.5MM/color paper box |
Target Market(s) | North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Western & Southern Europe, Northern Europe, Central & Southern Asia, Middle East |
Send your inquiry to this supplier