Passed CE and ISO YTSING-YD-1343 China Wuxi Corrugated Laminating Machine
product specifications
Thickness | 0.3-0.8mm |
Coil material | Galvanized/Pre-painted steel |
Coil weight | 5000kg |
Coil width | 1250mm |
General specification of production line
Total power required | 11kw |
Dimensions(L*W*H) | 9.0m*1.4m*1.6m |
Overall packing shipment | One 40ft container |
Working hours per day | 8 to 16 hours |
Set up time | 15 min |
Line direction | Left to right while facing operator panel |
Machine frame | H-BEAM frame |
Variable line speed | 25mtr./min.(not including cut) |
Material loading system | Manual |
Accuracy level | Profile dimension +/- 0.5 mm |
| Angular dimension: +/- 1 degree |
| Bend/twist/warp: 0.5 mm/mtr |
| End flair(at cut end): +/-0.5 mm |
| Cut length: +/-1.5-2.0 mm |
Complete Line Consist Of |
Passive decoiler |
Infeeding applicator |
Roll forming machine |
Hydraulic shear |
Output table |
About our company and factory
Our advantage, 1.We can produce the cold roll forming machine according to customers final products and requirements. 2.We are focusing on the reputation.The after-sales service can be assured.Engineer are available to service machinery overseas. 3.We are focusing on the quality of the machine, and all of our products got CE, ISO, SGS certifications. 4.The price is reasonable.We as the manufacturer can provide you the high quality machines with the most competitive price.
Wuxi Yuanding Science And Technology Co.,Ltd is a professional exportation-oriented company which specialized in designing, manufacturing,sales and services in the field of cold roll forming machines.
Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example:
After-sale Serive -The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. -Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. -Training time: 5 days. -Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) China Wuxi Corrugated Laminating Machine China Wuxi Corrugated Laminating Machine