WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)
WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)

1 / 6

WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)

Get Latest Price
Send Inquiry
Model No. : Solar Panel Production Line
Brand Name : Argus

Product description

WUHAN SUNIC 100MW solar panel production line price solar panel 300w automatic turnkey module 1kw solar panel(Argus)     First, we have to know 3 things to make a full trunkey project. 1. How many hrs do your staff work in one day? How many days in one year? 2. What is your expect annual production power of the production line? 5mW? 10mW? 30mW?...? 3. What kind of solar panel you want to produce? 230W....? Notes: Different answers, different amouts of equipments are needed.   Summarize 1. Production Scale:  Annual 5MW 10MW 30MW 100MW output solar cell module production capability. 2. Main Content:  The project intends to invest USD182,970.00, place cover over 3000m2 of plant, purchasing the production  equipments, test devices and other tools to compose the solar cell module production line. It is including the  installation and training in the turnkey project. 10MWp initial capability can be expended to 30MWp in six month,  then to 50MWp in near future.     Project Structure 1. Product and Capability: The project scale is 10MWp and can be expended to 30MWp. The specification of the solar cell module is 1~280W.  The specific size can be adjusted according to the demand of the market.  2. The Production Process   Layout Image     Main Equipment 1) Main Production Equipment: Cell Test Apparatus, Laser Scribing Machine, Laminated Machine, Framing Machine. 2) Main Test Equipment: Module Test Apparatus, EL Defects Tester.   3) Other Auxiliary Equipment and Tools: Welding Work Table,Layingtable,Handtrucks, Welding Model and other  equipments and tools.The Production Environment Plant area is 3000m2. The requirements for the environment are as follows: 1) Except for the special requirements, the light intensity, temperature, humidity, atmospheric pressure, ventilation and  disposal facilities in plant should be able to achieve the general requirements of electronic products for assembly plant.  2) The temperature of repository for Solar Cell, EVA, TPT is 25°C±2°C. 3) The plant for solar cell scribing, welding, solar module laying and laminating should be general purification plant, room  temperature should be 25°C-30°C 4) The room temperature of plant for solar cell test and module test should be 25°C±2°C. According to the above requirements and the demand of the process, it needs to build Raw Material Warehouse,  Preparation Workshop Plant, Solar Module Laminating and Packing Line (Purification Plant), Solar Cell and Module  Testing Line(Purification Plant) and Storehouse.  All Equipments and Auxilaries     Success Cases Our Turnkey Solution   Main Equipment of Our Solar Panel Production Line 1) Main Production Equipment: Cell Test Apparatus, Laser Scribing Machine, Laminated Machine, Framing  Machine. 2) Main Test Equipment: Module Test Apparatus, EL Defects Tester.   3) Other Auxiliary Equipment and Tools: Welding Work Table,Layingtable,Handtrucks, Welding Model and other  equipments and tools.The Production Environment Plant area is 3000m2. The requirements for the environment are as follows: 1) Except for the special requirements, the light intensity, temperature, humidity, atmospheric pressure,  ventilation and disposal facilities in plant should be able to achieve the general requirements of electronic  products for assembly plant.  2) The temperature of repository for Solar Cell, EVA, TPT is 25°C±2°C. 3) The plant for solar cell scribing, welding, solar module laying and laminating should be general purification  plant, room temperature should be 25°C-30°C 4) The room temperature of plant for solar cell test and module test should be 25°C±2°C. According to the above requirements and the demand of the process, it needs to build Raw Material Warehouse,  Preparation Workshop Plant, Solar Module Laminating and Packing Line (Purification Plant), Solar Cell and Module Testing  Line(Purification Plant) and Storehouse. Contact Information Cathy(Overseas) Wuhan Sunic Photoelectricity Equipment Manufacture Co., Ltd. Web:  E-mail: cathy at sunic.com.cn 
Mob: +86-15671685396 TM: cn209784954
Skype: cathy2007315
Add: 4#, Huanglong Shan North Road, East Lake High-Tech District,  Wuhan, P.R. China. P.C.430070
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628