V process foundry equipment for counter weight
V process foundry equipment for counter weight
V process foundry equipment for counter weight
V process foundry equipment for counter weight

1 / 2

V process foundry equipment for counter weight

Get Latest Price
Send Inquiry
Model No. : VM-A
Brand Name : Sandry

Product description

      Product Description V process foundry equipment for counter weight   Located in Qingdao, Sandry Machinery Co., Ltd. is a professional manufacturer of  V-process molding line(and related equipments) , Lost foam casting molding  machine line (and related equipments), Resin sand reclamation molding line  (and related equipments),Dust removal equipment and sand mixer. We have   7 years  of experience  in casting molding machinery  and have a good reputation  in this field.  We put good faith and quality first in mind. We sincerely hope to  have good cooperation with foundry enterprises with first-class technology, first-class quality,  first- class service to create the future.     Vacuum molding (V-process)  is a variation of the sand casting process for most  ferrous and non-ferrous metals, in which unbonded sand is held in the flask with a vacuum.  We can manufacture all kinds of V-processmolding line such as 10t/h sand treating systerm,30t/h and 60t/h sand treating systerm.Customized one is available.   TECHNOLOGY PROCESS 1,Heat EVA film  2,Cover the film on the mould 3,Spray a coating in a certain baume degree 4,Put on the empty flask 5,put sand into the flask 6,cover film on the full flask 7,vacuate the sand flask and lift the mould 8,pouring  9,loose the sand flask   Features: 1,V-process is known for not requiring a draft because the plastic film has a certain degree of lubricity and it expand slightly when the vacuum is drawn in the flask.  2,The process has high dimensional accuracy. 3,no moisture related defects, no cost for binders, excellent sand permeability, and no toxic fumes from burning the binders 4,the pattern does not wear out because the sand does not touch it. 5,Take good use of sand, the material recovery rate is 95%
MAIN EQUIPMENTS Vacuum stablized system: Vacuum pump, Vacuum meter, Surge tank, dust removal tank, steam separator Molding system: Die shoe, Heater, sand molding box , Vibrating table,  Manipulator, Die lifter. Sand reclamation system: Sand screen, Elevator, Conveyor,sand flask       After-Sales Service Equipment Installation, Commission, Training, Warranty and After sales Services 1. Installation  A. Under the following conditions are satisfied, the seller’s installation and construction team will start equipment  installation and commissioning for a period of four weeks;   a. Infrastructure installation, civil construction, maintenance have been completed, and meet the installation requirements;  b. The cooling water pipes are connected in place. Pressure and flow meets the seller’s demand;  2. Commission When commission, what should the two parties do? The supplier’s responsibility a.the supplier should send one or two engineer to the buyer’s plant; b.The supplier should provide the materials needed for applying for visa; The buyer’s responsibility a. The buyer should apply for visa for engineer(Or the seller apply, but the buyer pay for the fee)b.The buyer should provide food and room for engineer during installation,commission and training at the buy’s plant; c. The buyer should be responsible for the following:

No.

Item 

1

Round-trip ticket from China to the buyers country

2

Round-trip ticket from Qingdao to Beijing

3

Rooms and meals in Beijing

4

Health Certificate 

5

Salary of Commission(100USD/day)after arriving the buyers plant

Notice: The expense needed for installation,commission and training should be paid separately. 3. Training The training will be run through the entire process of equipment installation and commissioning, and after normal operation, the supplier will provide the training, proper and safe methods of operation and personal protection knowledge to the operators;  4.  Warranty  The seller guarantees that the quality guarantee period is 12 months in the condition of equipment and materials without problems; This 12-month period counts as the earlier one of the following two time points: a. It should account at the date of signing the final acceptance of goods or six month after the goods at the buyer’s plant; b. If the debugging is caused by the seller, the warranty period will extend its considerable time;   Exhibition view   Delivery   Company Information       
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628