UL cUL DLC LED bay lighting lm-80 tested with 5 years warrant
UL cUL DLC LED bay lighting lm-80 tested with 5 years warrant
UL cUL DLC LED bay lighting lm-80 tested with 5 years warrant

1 / 1

UL cUL DLC LED bay lighting lm-80 tested with 5 years warrant

Get Latest Price
Send Inquiry
Model No. : GI-LED bay lighting lm-80 tested
Brand Name :

Product description

  • Product Details

Basic Specification

Lamp voltage 100-277V, 347-480V
LED chip CREE
Driver Mean Well UL drivers
Certificates UL/CUL/DLC
Product type LED bay lighting lm-80 tested
Voltage 120-277V
IP IP65
Finishing Color Black
Material Aluminum, Glass
Application Square Lighting
Light Source LED

Detail Description


                                                     
 

1. Specification of LED bay lighting lm-80 tested:

Model NO. GI-FLHB 10/11/15/16/17 GI-FLHB 18/14 GI-FLHB 15-   DLC                          GI-FLHB 16-DLC GI-FLHB 14\' GI-FLHB 06/10/15/16HV GI-FLHB13HV
Power (W) 100 / 125 / 150 / 200 /300 400 / 480 150 200 480 75 / 100 / 480
150 / 200
Replace MH/HPS (W) 200 / 250 / 300 / 400 /600 800 /1000 300 400 1000 150 / 200 / 1000
300 /400
Luminous Flux(lm) 9,200 / 11,000 /13,100 / 17,500 /27,600 36,800 /41,800 14,100 18,800 43,950 6,600 / 9,100 / 42,600
13,600 /18,200
Beam 27° / 61° /90° / 110° 90° 90° 61° 27° / 61° /90° / 110°
Angle
Voltage 100-277V 100-277V 347V / 480V
Driver Mean Well
CCT WW/NW/CW CW CW CW WW/NW/CW
Light Source                                                                            CREE
CRI (Ra>)                                                                             70
IP Rating                                                                             IP65
Lifespan                                                                            50000 Hours
Warranty                                                                             5 Years
Certificates UL/cUL UL/cUL/DLC UL/cUL
                                                                             LM79/LM80/IES
Testing
 
 


2. Advantages of  LED bay lighting lm-80 tested:
1) The most powerful LED light ,replacing 1,000W MH/HPS lamps
2) Universal voltage: 100-305V, 347-480V
3) High quality CREE chips
4) Mean Well UL/cUL driver,
5) UL/cUL listed DLC qualified for government rebate for North America
6) Excellent heat sink with Copper heat pipe
7) 216°rotatable mounting bracket
8) High reflective rate of 92%
9) E-PTFE waterproof breathable membrane
10) Suitable for both Indoor and outdoor uses.

3.Parameters comparison sheet ( LED bay lighting lm-80 tested with Traditional Lamps)

Model No.

100W

FLHB

200W HPS 200W FLHB 400W HPS 300W FLHB 600W HPS

400W FLHB

800W HPS

 480W FLHB

1000W HPS

Luminous
Flux (lm

9,200lm 20,000lm 17,500lm 40,000lm 27,600lm 60,000lm 36,800lm 60,000lm 44100lm 60,000lm
CRI (Ra>) 70 50 70 50 70 50 70 50 70 50

IP Rating

IP65 No IP65 No IP65 No IP65 No IP65 No

Lifespan
(Hours)

50,000 1,000~3,000 50,000 1,000~3,000 50,000 1,000~3,000 50,000 1,000~3,000 50,000 1,000~3,000
Warranty
(Year)
5 6 ~12 months 5 6 ~12 months 5 6 ~12 months 5 6 ~12 months 5 6 ~12 months
Energy Saving
Per year
(kw/h)
562 kw/h 1,123 kw/h 1,685 kw/h 2,246 kw/h 2,894 kw/h


 


4. Dimension  of  LED bay lighting lm-80 tested:

5. Design advantages of  LED bay lighting lm-80 tested:


6. Applications of  LED bay lighting lm-80 tested:
Widely used in Commercial Buildings ,Outdoor advertising ,Warehouse, Hall , Square, Golf &Football Field, Gas Station, Stadium, Airport, Landmark, Flyover, Gymnasium, Vessel, etc.

7. Package details of  LED bay lighting lm-80 tested:









1). ISO9001:2008 certificates, ETL/CETL, DLC, CE/ ROHS certificates.
2). Professional R & D center, quickly after-service team, long warranty period.
3). Short production period, make sure delivery in time, which is usually 2 to 15 days after deposit.
4). Plenty experience on the installation of street lighting for the main street of the city.


Additional Information

Payment Terms L/C, T/T, Western Union, Paypal
Minimum Order 5 PCS
Lead Time / Delivery Time 3 Day(s)
Sample Available NO
Delivery Details Delivery date for LED bay lighting lm-80 tested 5~7 days for samples, 7 - 15 days for bulk orders
FOB Port Shenzhen
Loading Info By DHL/UPS/Fedex, or by Sea
Packing Info 1pc of LED bay lighting lm-80 tested per carton box
Target Market(s) North America, Oceania, Southeast Asia, Eastern Europe, Africa(except Middle East), Hong Kong/ Macao/ Taiwan, Latin America, Japan & Korea, Mainland China, Western & Southern Europe, Northern Europe, Central & Southern Asia, Middle East
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628