Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe
Tube welding roll forming machine ,high frequency welding pipe

1 / 6

Tube welding roll forming machine ,high frequency welding pipe

Get Latest Price
Send Inquiry
Model No. : HG32/HG50/HG76/HG127
Brand Name : ZHONGTUO

Product description

     Tube welding roll forming machine ,high frequency welding pipes Product Description Tube welding roll forming machine-high frequency welding pipe making equipments: The tube welding roll forming machine is intended for manufacturing of round pipe of Φ10mm-Φ127mm with thickness of 0.5mm–5mm from cold-rolled and hot-rolled coil strip by means of unclosed tubular blank with its subsequent welding into tube, edge heating by means of solid state high-frequency welder, longitudinal seam welding in rolls of tube welding machine, cooling, further sizing or shaping and on-stream cutting of endless tube in measured lengths. Finished product will be of round, square or rectangular pipe.

Machine 

Description

Quantity

Delivery time

Container 

Type

Price USD

 FOB 

TIANJIN

tube welding roll forming machine

 1 SET

45 working days

after receiving

deposit

One 40 FT 

Up to final design

USD79000---249000

    The following types tube welding roll forming machine:       Working process: {SteelTape}→→ Double-head un-coiler →→Strip-head Cutter and welder→→Spiral Accumulator→→Forming section(Flattening unit +Main driving unit +Forming unit +Guide unit +High frequency induction welding unit +squeeze roller)+ De-burr frame →→Cooling unit →→ Sizing unit and straightened →→Flying saw under computer-control →→ Run-out table   1. Double-head un-coiler   Briefing: Rotary type to change coils easily, with a pneumatic brake. Mandrel expansion by Pneumatic Mandrel position rotation shall be manual Pneumatic brake 2. Shearing & butt welding machine 2.1 Hydraulic shearing parameters machine: -     Cutting by hydraulic -     Width:       ≤160mm -     Thickness:   ≤2.0mm 2.2 Butt welding machine by manual   -     welding machine     3. Horizontal spiral accumulator
3.1 Low bracket: 1 set
3.2 Revolver: 1 set
3.3 7 rollers Flattening unit: 1 set
3.4 2 rollers feeding: 1 set
3.5 Accumulator: 1 set 
- Feeding speed: Max.200m/min 
- Storing capacity: 500meter -700 meter 
3.6 High bracket: 1 set 4.Forming & sizing section 4.1   Forming mill gearbox, universal joint 4.1.1   Mill entry flattener by five-roll passive levelling, one pair of sending roll, two pairs of vertical roll     5. Welding section 5.1     Welding section consist of:        -      Seam guide unit:                 1 set        -      Squeeze stand:                    2 rollers         -      De-burr frame:                     1 set (2 heads) -     Horizontal unit for seam ironing:      2 rollers 5.2    Cooling section -     Cooling trough:                      1 set     -   Cooling trough length:             3 m  6. CNC flying friction saw 6.1     Flying cut-off, mechanical section consist of: -   Saw disk:           OD400mm×ID40mm×2.8mm -   Saw waver:            Pneumatic -   Pipe clamp:         Pneumatic -   Saw carriage travel:  Rack and pinion with gear lath        -      Motor for travel:      DC 11KW -   Motor for cutting:     AC 11KW -   Length Tolerance:        0-6mm 7.  Rollers 7.1     Forming and sizing Rollers material        -      Material:   Cr12        -      Hardness:     60 HRC +/-2 7.2 Welding rollers material -   Material  :   H13 -       Hardness:     50 HRC +/-3                 Packaging & Shipping       After Service a.One year guarantee for whole machine. b.24 hours technical support by email or calling c.If there is any problem found of the machine, we will repair it for free in one year.    Company Information         FAQ   Payment method: Method 1: Payment of the contract with following schedule: - 30%: The payment shall pay by T/T the down payment to the Seller within 15 days after the signature of the Contract. The Contract then comes into effect. - 70%: The buyer shall pay to seller the remaining 70% of total contract amount before the seller’s ship the machine to XINGANG, CHINA. Method 2 L/C is also acceptable.   Technical Documents The Seller shall submit the following documents in English: 1. Foundation Plan (including the arrangement of water, electricity and air ect.) 2. Arrangement Plan 3.Operation Instruction (including the structure diagrams of the equipment, operation instruction, maintenance and trouble shooting, safe rules, consumable parts list and purchased parts list) Installation, Commissioning, Test and Training 1. The engineers from the Seller shall supervise the installation on site and fulfill the commissioning. They should start off within 10 days after they get the information from the Buyer. 2. The Buyer signs in the Certificate of Acceptance. 3. The Seller trains the operators of the Buyer during the commissioning 4. Commissioning: about 3 engineers in 30 days. 5. The Buyer shall pay for the international air tickets and the local, such as board and lodging, daily transportation, communication,Insurance, etc. The Buyer shall pay USD 100 /day /person to the Seller for the commissioning. 6. The Buyer shall prepare an interpreter for better communication between the two sides. 
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628