Iron door info 1. Iron door info
Item | Top Quality Steel Door With Glass SD-009, Feelyiron steel door, Special Iron Entry Door, villa iron door, |
Material | Forge iron |
Style | Double door, flat top / square top |
Size | 6*8ft/customized |
Opening | Swing |
Anti-rust treatment | sand blast, hot zinc spray, epoxy primer(twice), acrylic acid black paint, hand applied faux finish, varnish coat |
Threshold | Intergrated threshold with door jamb to ensure the strongness of the iron door |
Weather stripping | Rubber weather stripping seals around jamb, door panel and glass panel |
Polyurethane foam | Jamb, panel, threshold and kickplate are fully injected with polyurethane foam |
2. Material parameters (can be customized)
Jamb & Door panel | 2*6" 12 guage tubing |
Scroll work | 5/8" solid steel |
Glass | 5/8" dual paned temper glass |
Lock holes | 2-3/8" backset, 2-1/8" diameter, 5-1/2" center to center |
3. Manufacture procedure » CAD drawing » Prepare material » Assemble » Welding » Polishing » Sand blasting » Hot Zinc Spray » Epoxy slurry to fill minor imperfections
» Epoxy primer first time » Epoxy primer second time » Acrylic acid black paint
» Hand applied faux finish » Varnish coat
4. Finish option
5. Glass option
6. Door accessory
Packing & loading 7. Packing and loading
handle option 8. Handle option
How to order 9. How to order
Shipping & payment 9. Shipping & payment
MOQ | We don't limit MOQ |
Sample: available | Lead time: about 30 days after order confirmed |
Cost: contact us to discuss |
Packing detail | Door panel:packed with EPE, bubble wrap,corrugated paper, polywood case. "glass fragile" and " this side up" on the crate for the convenience of discharge at your side. |
Door frame: packed with EPE and bubble wrap. |
Shipping | FCL: the crate will be put in rows and the frame will be put above the crates. |
LCL: the crates and frame will be put into two iron stands for the safety of shipping and the convenience of discharge. |
Lead time | 1-5 sets: about 25 days |
1 20ft container: about 30 days. |
2-3 containers: about 40 days. |
Delivery clause | FOB Xiamen |
Terms of payment | Orders 00 or under: full payment is expected when order is approved. |
Orders over 00: 50% as deposit, balance against copy of B/L. |
We accept T/T and L/C for the payment. |
Iron door image 10. More pictures of Wrought iron entry door
Contact us 11. Contact us