Key Feature: l State-of-the-art Technology & Facilities l More than 30 years experience in design & production of bulk material handling system l More 30% stall are engineers and technical background; l Patented technology,professional design,accuracy control,safe and reliable operation l Max. 150t ESR furnace; Design Management:
3D • DESIGNFE ANALYSIS • 3-LEVEL REVIEW POLICY • COMPONENT PROCESS ROADMAP & REQUIREMENT • COMPONENT SINGLE PIECE DRAWING
Process Management:
Welding & Machining MPP • Welding Process Flow Chart • Welding Procedure • Heat Treatment Procedure Assembly Procedure • Painting Procedure • Lifting Procedure Workshop Facilities (Phase 1):
| Welding workshop | Material preparation workshop | Machining workshop | Assembly workshop |
Dimension | 205m×36m×2 | 156m×26m | 217m×36m×2 | 217m×36m |
Overhead crane | 2×150T/16m | 75T/16m | 2×150T/16m | 2×150T/16m |
Main gate | 16m×12m | 12m×10m | 16m×12m | 16m×12m |
|
Outdoor Assembly Area:
Certificates & Qualification:
After-sales Service:
Supervision for Installation, Commissioning & Training for Operation & Maintenance Pictures: