Specifications Steel Wire Cable
1. Material: SS304 or SS316
2. Packing: By plastic reel or wooden reel
3. Delivery: Within 30 day
Steel Wire Rope /Steel Wire Cable /Steel Wire Strand Product Description
Steel Wire Cable Nominal diameter:1.2mm to 6mm Lay : right hand regular lay or left hand regular lay Standard: GB , ISO, DIN,AST Application: Used for aircraft cable, general use steel wire rope, steel wire rope for control
2. wire rope Descriptions:
1.Steel Grade: | Bao steel , Sha steel , C45#,C55#, C60# ,C65# ,C70# ,C75# |
2.Construction: | 8*19S+FC |
3.Diameter Range: | 8.0~24.0mm |
4.Lay: | Right regular lay, Left regular lay, right lang’s lay, left lang’s lay |
5.Coating | Bright(ungalvanized), Galvanized, stainless, PVC or Grease |
6.Tensile of strength: | 1670/ 1770/ 1870 N/MM2 |
3.Friendly reminder: If overweight, abrasion, misused and maintain in wrong way, the steel wire rope, sling can not be used. For your safety and other plant. Please care: 1. Before use steel wire rope, sling examine the abrasion and damage. 2. It is forbidden to use abrasion, damage and discard steel wire rope, sling. 3. It is forbidden to overweight, wire rope, sling. 4.Consult the right way of using steel wire rope and sling relative regulation. 4.wire rope Technical Specifications
5. Wire Rope process
Packaging & Shipping Wire Rope packing
1 | Package | Packed On strong wooden wheel, plastic reels ,wrapped with PP cloth, with label on the reel side and then pack by wooden pallets or wooden crates before shipping. or According to customer's needs. |
2 | Delivery Time | 15-30 days after received deposit |
3 | Payment Terms | T/T 30% down payment in advance, T/T balance 70% before delivery date.or L/C |
Steel Wire Rope /Steel Wire Cable /Steel Wire Strand 1.samples are avialable, small quantity can be free. 2.we can produce according to customers's special requirements. 3.we will serve you heart and soul around the colock. 4.the following certificates prove our strength Company Information
FAQ Trade terms: FOB, CFR, Payment terms: T/T, L/C, Western Union, Escrow, etc(Usually 30% T/T in advance, 70% T/T after shipments) MOQ: 1 ton