Stainless Steel Replacement Strike Plate, Plate Lock Cover
Stainless Steel Replacement Strike Plate, Plate Lock Cover
Stainless Steel Replacement Strike Plate, Plate Lock Cover
Stainless Steel Replacement Strike Plate, Plate Lock Cover

1 / 2

Stainless Steel Replacement Strike Plate, Plate Lock Cover

Get Latest Price
Send Inquiry
Model No. : ZML2250,replacement strike plate
Brand Name : ZML,replacement strike plate

Product description

Stainless Steel Replacement Strike Plate, Plate Lock Cover
 Item No  ZML2250,  replacement strike plate
 Part name Stainless Steel Replacement Strike Plate, Plate Lock Cover
 Material  Steel , Deadbolt Strike Plate, door Strike Plate
 Finish  Brass or chrome , replacement strike plate
 Package   100 pcs / ctn  for  this  replacement strike plate.
 Delivery port  Ningbo / Shanghai
 Delivery time  30-40 days after get your deposit
 Service  Sample / ODM / OEM service provide
 Certificate  ISO 9001:2008
  Stainless Steel Replacement Strike Plate, Plate Lock Cover     replacement strike plate   Stainless Steel Replacement Strike Plate, Plate Lock Cover     replacement strike plate   Stainless Steel Replacement Strike Plate, Plate Lock Cover     replacement strike plate   Stainless Steel Replacement Strike Plate, Plate Lock Cover     replacement strike plate: Stainless Steel Replacement Strike Plate, Plate Lock Cover   replacement strike plate       Contact: 1. Packing: 1pcs replacement strike plate into polybag + inner box + master carton.   2. Delivery time: 30-40 days after order confirmed.   3. The quoted price is valid for 30 days due to the fluctuation of raw material cost.   4. Payment Terms: TT/LC at sight   5. Samples supply: we surely provived you samples required, sample charge is decided based on the requested q'ty and your cooperation, but freight cost paid from you withou dout.   6. Samples delivery: normally will be ready within 3 working days.
Please contact our After-sales service department in time within 30days after you received the cargo.
Tel: 0086-0574-8895-2586  Time: 9:00 a.m.- 6:00 p.m. (Beijing time)
Process Please provide the copy of Sales Contract and describe the problems appeared.
Problems confrimation:
Slight problem: Please send the proof to our After-Sales Department, we will reply within two days.
Serious problem:  
                          A We will dispatch our Quality and Problems Appraisers to make a confirmation.
                          B Have a negotiation of the compensation and sign agreements
                          C Our After-Sales Department will perform the duties as the agreements
     
Send Inquiry

Product Alert

Subscribe to your interested keywords. We will send freely the latest and hottest products to your Inbox. Don't miss any trade information.

版权所有 © 宁波全贸信息技术有限公司 浙ICP备12012821号-1 浙B2-20200628