1 / 5
Model No. : | Customized |
---|---|
Brand Name : | DIXIN |
Delivery Time : | 35days |
Product description
Roofing metal siding wall panel machine
Product Description
- Strong Power siding wall Roll Forming Machine used for produce furring channel and drywall profile.We can manufacture sizes as customers request.
- Strong Power siding wall Roll Forming Machine used casting frame,this is kind of casting frame never cutting and welding,so this frame very strong and high precision.This kind of frame have long life working time.
- Strong Power siding wall Roll Forming Machine,we used double bearings,so we make sure machine working low noise and more stable working.
No. |
Item |
Parameters |
1 |
Material of frame |
(high grade) 400mm H shape steel |
2 |
Total power
|
4KW |
3 |
Step of forming roller
|
12 steps |
4 |
Diameter of shaft |
74mm
|
5 |
Thickness of middle plate |
12mm |
6 |
Bearing |
6210(high grade) |
Packaging & Shipping
a. Need one 20 or 40 ft container, according to your final drawing.
b. The main body of machine is fixed to container by 8mm diameter steel wire, rollers and shaft is
covered with anti-rust oil.
c. Spare parts in carton box.
The machines will be ready within 10 days from receipt of down payment as well as approval of sales contract, technical scheme and profile drawing. The shipment will be made within 10 days after the seller receives the balance by T/T.
Terms of payment:
30% of the contract amount as down payment after signed the contract; the balance is to be paid by T/T before shipment. Installation charge is to be paid before installation by T/T.
Cost of installation:
The buyer should pay the installation charges (USD 100 one man one day). to the seller`s appointed account by T/T before the seller`s technicians go to the buyer`s factory. The buyer pays the seller`s technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Product warranty:
The main machine is 12 month, the electric parts are 3 months and we will provide the technical support for the whole life of the equipment.
Company information
Customers
1.How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.what is your guarantee period?
Guaranteed against malfunctions due to manufacturing defects for 12 months from the date of loading.
Other products
Welcome to our company !
If you have any question,please contract me !
Send your inquiry to this supplier